Karnafuli Hydropower Station
History
In 1956, to meet the increasing electricity demand in what was then East Pakistan, a hydroelectric dam was constructed on the Karnaphuli River, creating the artificial Kaptai Lake.
Funded by the United States, the Pakistani government began building the Kaptai Hydroelectric Power Station in 1956. The project was completed in 1962 by International Engineering Company and Utah International Inc.The dam, measuring 670.6 meters in length and 54.7 meters in height, features a 745-foot-long spillway equipped with 16 gates capable of discharging over 525,000 cubic feet of water per second. Initially budgeted at approximately 25.4 crore, the project's final cost exceeded 48 crore.
Capacity
The initial planned capacity of the power plant was set at 120,000 kilowatts. In the early stages, Units 1 and 2, each with a capacity of 40 megawatts, were installed. In 1969, work began on Unit 3, which had a capacity of 50 megawatts. Currently, there are five units in operation, collectively generating a total of 230 megawatts.
References
- ^ প্রতিনিধি, রাঙ্গামাটি (2024-07-03). "কাপ্তাই পানি বিদ্যুৎ কেন্দ্রের চারটি ইউনিট সচল, ১৬৪ মেগাওয়াট উৎপাদন". ইত্তেফাক. Retrieved 2024-08-25.
- ^ "রাতেই ছাড়া হবে কাপ্তাই হ্রদের পানি, সতর্কতা জারি". Bangladesh Journal Online (in Bengali). Retrieved 2024-08-25.
- ^ "পানি বিদ্যুৎ কেন্দ্রের বাঁধ". www.kaptai.rangamati.gov.bd. Retrieved 2024-08-25.
- ^ রাঙামাটি, জেলা প্রতিনিধি (2024-04-02). "দ্রুত কমছে কাপ্তাই হ্রদের পানি, বিদ্যুৎ উৎপাদন সর্বনিম্ন পর্যায়ে". dhakapost.com (in Bengali). Retrieved 2024-08-25.
- ^ "কাপ্তাই হ্রদে পানিস্বল্পতায় কমেছে বিদ্যুৎ উৎপাদন". banglanews24.com (in Bengali). 2024-02-08. Retrieved 2024-08-25.
External links
Hydropower Station Karnaphuli Hydropower Station at Banglapedia