Kelsey Creek (Washington)
Drainage basin
The Kelsey Creek drainage basin is about 10,870 acres (4,400 ha), including about 75% of the city of Bellevue in addition to a portion of Redmond. Tributaries include Valley Creek, Goff Creek, the West Tributary, Sturtevant Creek, Richards Creek, East Creek, and Sunset Creek. Kelsey Creek flows into the head of the Mercer Slough through a large concrete culvert which has been built to allow salmon to ascend easily via a few short drops of the creek.
History
The Duwamish, whose main settlements were located in what is present day Renton and Seattle, maintained a small outpost settlement called Satskal along the Mercer Slough.
Originally the Kelsey Creek drainage basin included what is now Phantom Lake. In the late 1800s, however, farmer Henry Thode redirected the Phantom Lake outlet to Lake Sammamish, resulting in a reduced water flow to Kelsey Creek.
For centuries, the Mercer Slough wetlands had been a swamp, marsh, and shallow water area, with the Mercer Slough itself being effectively a shallow inlet of Lake Washington. In 1894, a small sawmill operated at the upper end of the slough and both logs and processed timber would be floated down the slough to Lake Washington. At the time, the slough was both wide enough and deep enough to accommodate log rafts, launches, tugs, small steamers, and stern-wheelers.
Following the completion of the Lake Washington Ship Canal and Hiram M. Chittenden Locks in 1917, the water level of Lake Washington was lowered 8.8 feet (2.7 m) exposing the lake bed along the course of the present-day slough. The Mercer Slough was partially dredged in the 1920s to make it navigable to small watercraft. Today, canoes can be rented to explore the lower waterway.
The King County government and City of Bellevue began acquiring parcels in the Mercer Slough in 1957 for preservation of the wetlands and surrounding natural areas. By 1990, 311 acres (126 ha) had been purchased.
See also
References
- ^ U.S. Geological Survey Geographic Names Information System: Kelsey Creek
- ^ "Kelsey Creek (Sites 0444 D444)". Retrieved 2007-12-24.
- ^ "Water Resources Data-Washington Water Year 2005; Lake Washington Basins" (PDF). USGS. Retrieved 3 August 2009.
- ^ Johnston, Greg (August 12, 1999). "Urban oasis: Mercer Slough offers quiet respite amid the concrete jungle". The Seattle Post-Intelligencer. Archived from the original on October 15, 2002. Retrieved January 22, 2018.
- ^ Neiwert, David (2005). Strawberry Days. Palgrave Macmillan. p. 28. ISBN 978-1403967923.
- ^ "Weowna Creek Restoration -- High Tech - Low Impact". Retrieved 2007-08-15.
- ^ Williams, David B. (2016-11-21). "Jury rejects damage claim against King County for lowering of water levels caused by the Lake Washington Ship Canal in verdict announced on April 4, 1924". Historylink.org .
- ^ Ervin, Keith (November 19, 1995). "Forever wet: Bellevue takes a walk on the wild side". The Seattle Times. p. 16.