History
The construction contract for this station, along with Bedok station, was awarded to Ohbayashi Corporation, which partnered with Resources Development Corporation in January 1986.
As with most of the above-ground stations built in the past along the East–West Line, they were built without platform screen doors. After several successful tests at Jurong East, Yishun and Pasir Ris and eventually, installation of the half-height screen doors to prevent commuters from falling onto the train tracks. Installation started in December 2010 and the platform screen doors started operations on 25 February 2011 with Kallang.
This station is also installed with high-volume low-speed fans, which started operating on 14 July 2012, together with Paya Lebar station.
Privacy screens were installed from Kembangan MRT station to Lorong Mydin to minimise noise impact from residents, from September 2016.
References
- ^ "Land Transport DataMall". mytransport.sg. Land Transport Authority. Archived from the original on 14 August 2024. Retrieved 14 August 2024.
- ^ "MRTC awards two jobs on eastern line". The Business Times. 14 January 1986. p. 2. Retrieved 27 June 2024.
- ^ Wong, Siew Ying (January 26, 2008). "Above-ground MRT stations to have platform screen doors by 2012". Channel NewsAsia. Archived from the original on July 30, 2012. Retrieved February 1, 2012.
External links
Media related to Kembangan MRT Station at Wikimedia Commons