Khashm El-Girba Dam
The Khashm el-Girba Dam is a gravity and embankment composite dam on the Atbarah River about 4 km (2 mi) south of Khashm El Girba in Eastern Sudan. The primary purpose of the dam is irrigation.
The dam is equipped with canal headworks, located on its left bank, which divert water into a canal. When water levels in the reservoir are low, three pumps move water into the canal.
The main portion of the dam is an earthen embankment; the spillway and irrigation headworks sections are concrete gravity. The dam has a small hydroelectric power station, which was upgraded during the period 2002–04 to its current installed capacity of 10 megawatts (13,000 hp).
See also
References
- ^ "Sediment case study template_Khashm El Girba.indd". Archived from the original on 2020-10-30. Retrieved 2020-10-26.
- ^ Ahmad, Siyam. "Assessment of The Current State of The Nile Basin Reservoir Sedimentation Problems" (PDF). Nile Basin Capacity Building Network. p. A3. Archived from the original (PDF) on 9 October 2010. Retrieved 16 February 2013.
- ^ "Khashm Algirba Dam". Sudanese Hydro Generation Co Ltd. Archived from the original on 11 April 2013. Retrieved 16 February 2013.
- ^ "Khashm El Girba Hydro Power Station Rehabilitation (2002-04)". Heavy Engineering Ltd. Retrieved 16 February 2013.