Khurja Super Thermal Power Plant
Khurja super thermal power project or Khurja STPS is an under construction 1320 megawatt, coal-fired supercritical power plant at Khurja in Bulandshahr, Uttar Pradesh, India. The project is the first thermal power project by THDC Ltd, projected to cost ₹12676 crores (US$1.8 billion). It is a two unit power plant, with the first unit expected to be completed by September 2024 and the second by December 2024.
Project
THDC Ltd floated tenders for award of main package in June 2018. Land has been acquired by THDC and project completion is planned by 2023. The coal requirement would be 7.2 million tonnes per annum which will be sourced from the Amelia Coal mines in Madhya Pradesh.
Clearances
The project has been accorded environmental clearance by the Ministry of Environment, Forest and Climate Change (MoEF&CC). The environmental impact assessment report was submitted to MoEF&CC in November 2016.
Capacity
The planned capacity of the thermal power plant is 1320 MW (2 x 660 MW)
Stage | Unit Number | Installed Capacity (MW) | Date of Commissioning | Status |
---|---|---|---|---|
Stage I | Unit I | 660MW | Feb 2024 | Tenders floated |
Stage I | Unit II | 660MW | Dec 2024 | Tender floated |
References
- ^ PTI (2 April 2017). "Centre's green nod to Rs9,747 crore Khurja power project in UP". Mint. Retrieved 3 August 2018.
- ^ "THDC to float Rs 8,000 crore tender for Khurja thermal power plant - ET EnergyWorld".
- ^ "PIB grants pre-construction clearance to Khurja Super Thermal Power Plant - Times of India". The Times of India. Retrieved 3 August 2018.
- ^ "Khurja Super Thermal Power Plant gets environmental clearance". Business Standard India. 3 April 2017.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 27 July 2018. Retrieved 27 July 2018.
{{cite web}}
: CS1 maint: archived copy as title (link)