Kuthiran Tunnel
Right tube 944 m (3,097 ft)
(6 lanes total in twin-tube with dual carriageway)
Lane 2 - 40–80 km/h (25–50 mph)
Kuthiran Tunnel (Malayalam: കുതിരാന് തുരങ്കം) is a twin-tube six-lane highway tunnel in the South Indian state of Kerala. The tunnel is located on the National Highway 544 and it is owned and operated by the National Highways Authority of India. This is Kerala's first-ever tunnel for road transport and South India's longest six-lane road tunnel. Construction of the tunnel started in 2016 and completed by December 2021.
Nitin Gadkari, the Minister of Road Transport and Highways announced the opening of one of the twin tube tunnels through the social platform Twitter. The second tunnel opened in January 2022.
Present traffic
Kuthiran gradient is situated in the Kuthiran Hills, situated in the western part of Anaimalai Hills. The hills are part of Peechi-Vazhani Wildlife Sanctuary.
Kuthiran gradient was a major traffic bottleneck and an accident spot on the crowded Thrissur-Palakkad stretch of the 6 lane National Highway 544 (India) used by long distance traffic coming from Coimbatore, Salem, Chennai and Bengaluru. It was the missing link that was planned to be constructed when the Highway was designed.
The works on tunnel took more than a decade to complete due to geological and administrative challenges. The project was awarded in 2009 but the work on the tunnel only began in 2016.
On completion of works, both the tunnels reduced the distance between Kochi to Coimbatore by 3 kilometres (1.86 mi) but travel time got reduced by hours since there used to be traffic jams caused by heavy vehicles trying to traverse through the hills.
In August 2018 during 2018 Kerala floods, the tunnel was opened for passage of emergency vehicles. In June 2019 the tunnel was opened for four hours following a Gridlock caused due to an accident at Kuthiran Bridge. In October 2020, a Gridlock happened after an accident causing long queues extending to kilometers on both sides, and traffic resumed only in the evening after temporarily opening the under construction tunnel.
On 31st December 2020, seven vehicles collided in an accident and 3 people died at Kuthiran causing a gridlock. These type of gridlocks used to happen regularly at this spot due to frequent accidents, and people who are aware of this used to prefer alternative longer routes just for the sake of a reliable journey time. An RTI query in 2019 revealed 235 people have died in this stretch due to accidents in the past 10 years.
In January 2020, the tunnel was partially opened to facilitate Power Grid Corporation of India's underground cabling works between Thrissur and Palakkad.
On July 31, 2021, one of the two tunnels in Palakkad - Thrissur direction was officially opened for traffic following an announcement made by Nitin Gadkari through Twitter.
Cost
The Pragati group was subcontracted the work by the Hyderabad-based KMC company. Pragathi bagged the sub-contract at a cost of Rs 200 crore.
Dimension
The 6 lane twin tube tunnels will have length of almost 1 kilometer, left tube 955 m (3,133 ft) and right tube 944 m (3,097 ft), while the width and height would be 14 and 10 metres (46 and 33 ft), respectively. The tunnels would be located in a gap of 20 metres (66 ft). There are two emergency crossovers inside the tunnel.
Gallery
-
Time Lapse video of Kuthiran Tunnel
See also
References
- ^ "Work on left tunnel at Kuthiran begins". Dailyhunt. Retrieved 1 December 2016.
- ^ "Work on left tunnel at Kuthiran begins". Deccan Chronicle. Retrieved 1 December 2016.
- ^ "Kuthiran tunnel work resumes". Times of India. Retrieved 1 December 2016.
- ^ "One tunnel at Kuthiran opened for traffic".
Though the Mannuthy-Wadakkanchery six-lane work started in 2010, the tunnel work started only in 2016.
- ^ "One tunnel at Kuthiran opened for traffic". The Hindu. 1 August 2021. ISSN 0971-751X. Retrieved 1 August 2021.
- ^ "Kuthiran Tunnel Opening: Big news for Kerala, Tamil Nadu and Karnataka! One side of tunnel to be OPENED for public today, says Nitin Gadkari | WATCH video". Zee Business. 31 July 2021. Retrieved 31 July 2021.
- ^ "Major safety lapse as cops open Kuthiran tunnel to clear jam". www.onmanorama.com. Retrieved 1 August 2021.
- ^ Correspondent, Special (31 October 2020). "Traffic resumed to normal level at Kuthiran". The Hindu. ISSN 0971-751X. Retrieved 4 January 2023.
{{cite news}}
:|last=
has generic name (help) - ^ "Why Kuthiran drives fear into motorists today". OnManorama. Retrieved 4 January 2023.
- ^ Daily, Keralakaumudi. "Kuthiran tunnel partially opened as Power Grid's trial run commences". Keralakaumudi Daily. Retrieved 1 August 2021.
- ^ "One of two Kuthiran tunnels in Kerala declared open by Union govt". The News Minute. 1 August 2021. Retrieved 1 August 2021.
- ^ "Ministry of Road Transport & Highways, Government of India". morth.nic.in. Retrieved 17 July 2021.