Loading
  • 21 Aug, 2019

  • By, Wikipedia

L. Hoster Brewing Company

The L. Hoster Brewing Company is set of historic buildings in the Brewery District of Columbus, Ohio, United States. The site was listed on the National Register of Historic Places in 2009.

The complex is under renovation, expected to be completed in summer 2023. The new development will be called Front & Fulton; it will have restaurant, cafe, bar, office, and apartment spaces.

Attributes

In 2019, the site included eight buildings, constructed from about 1887 to 1967. The easternmost building was a 1960s-era Wasserstrom store.

History

The brewery from Front St. c. 1893

The brewing company was established in 1836 in the present-day Brewery District. It grew to encompass numerous buildings. By 1892, it became the leading Columbus brewery and a household name in Ohio. Around 1920, Prohibition began to hinder the industry, and the brewery created soda and imitation beer products, though without success, forcing its closure.

A portion of the building, facing Front Street, was demolished for "future development" in 1965, by S.G. Loewendick & Sons.

Legacy

A brewpub acquired the name "Hoster Brewing Company" in 1989, opening that year in the High Line Car House at 55 S. High St. The brewery served numerous beers, including the historic "Gold Top" lager brew, a new but similar recipe. It began distributing to local restaurants in 1991. The brewery shut down in 2001, and its assets were purchased by another brewer in 2004. The brewer began distributing the flagship beer again in 2005, utilizing regional breweries. In 2011, the Hoster Brewing Company moved to a 26,000-square-foot space in the Near East Side. The company will open a brewery and taproom near the John Glenn Columbus International Airport in June 2023.

The remaining brewery buildings are set to be redeveloped into a complex called Front & Fulton. The project was announced in 2019 and estimated at the time to cost $77 million, including a boutique hotel, rooftop bar, restaurants, as well as event, office, and retail space. The buildings received $5 million in Ohio historic preservation tax credits in 2019. It was planned for the former Wasserstrom store to be removed and replaced with a seven-story hotel. In 2021, the project was updated to a cost of $105 million, with 40 apartments and similar other uses, including four to five bars, restaurants, and coffee shops; the hotel was cut from the plan and replaced with a two-story restaurant and office space with a rooftop bar. The estimated completion date was moved from 2021 to summer 2023.

See also

References

  1. ^ "National Register Information System". National Register of Historic Places. National Park Service. November 2, 2013.
  2. ^ Weiker, Jim. "Plan to turn Hoster Brewing complex into hotel, offices, restaurants gets preservation tax break from Ohio". The Columbus Dispatch.
  3. ^ "Hoster set to bottle its namesake lager". Columbus Alive.
  4. ^ https://infoweb-newsbank-com.webproxy3.columbuslibrary.org/apps/news/document-view?p=WORLDNEWS&t=&sort=YMD_date%3AD&fld-base-0=alltext&maxresults=20&val-base-0=%22Loewendick%22%20%22central%20market%22&docref=image/v2%3A1467499E363272B3%40EANX-NB-1624449AA777E7F8%402439014-16243872D761B8E8%4032-16243872D761B8E8%40
  5. ^ https://www.bizjournals.com/columbus/news/2023/04/07/hoster-brewing-in-home-stretch-of-construction-co.html
  6. ^ Staff, 614now (June 28, 2019). "Columbus' next rooftop bar will be in a familiar Brewery District building".{{cite web}}: CS1 maint: numeric names: authors list (link)
  7. ^ "Former Hoster Brewing complex to include restaurants, offices".