Longyang Road Station
History
On 20 September 1999, this station is part of the initial section of Line 2 that opened from Zhongshan Park to this station that opened. Trial operations on the Shanghai Maglev opened on the last day of 2002.
The interchanges with Lines 7 opened on 5 December 2009. The interchange with Line 16 opened on 28 December 2014. The interchange with Line 18 opened on 30 December 2021, with the formal opening of Line 18 north section, the station becomes a five-line transfer station.
Structure
Longyang Road station consists of five parts, from north to the south respectively, Line 7, Line 2, Maglev Line, Line 16 and Line 18. Lines 2, 7 and 18 are under ground, while the station hall of Line 2 is on the ground level. The station on Line 16 and Maglev Line are elevated stations.
The platform of Lines 2, 7, 18 are standard island platforms. There are 2 sets of island platforms at Line 16, while trains provide service usually on platforms 1, 2 and 3. The platform 2 is usually used for express trains (stops only at Luoshan Road station, Xinchang station, Huinan station, Lingang Avenue station and Dishui Lake station) and non-stop trains (directly heads for Dishui Lake). The train coupling and decoupling take place on weekdays at platform 1.
-
Concourse for L2
-
Concourse for L7
-
Platform of Line 7
-
Exterior of Maglev station
-
Line 16 platform
-
Station hall of Line 18
-
The platform of Line 18
-
Station name wall at the Line 18 platform
Transfer
Since the opening of the north section of Line 18, Longyang Road has become a five-line transfer station. Between the part of Line 7, Line 2, Line 16 and Line 18, there are two mono-directional transfer passages. For example, passengers at Line 7 can go through a transfer passage and arrive at the station hall of Line 2, which takes about 3 minutes. Then across the station hall of Line 2, passengers walks above one minute to arrive at the west end of Line 16 station hall. Passengers can either turn left to transfer to Line 16, which takes 3.5 minutes, or walk straight to transfer to Line 18, which takes about 1 minute and 45 seconds.
Passengers at the Line 18 station hall at the south end of the whole station can walk to the station hall of Line 16 through a transfer passage at the east, which takes about 3.5 minutes. Then passengers can arrive at the station hall of Line 2 through the station hall of Maglev Line and a set of mono-directional escalator, which takes about 2.5 minutes. Following through the transfer passage, passengers at the Line 2 station hall will walk to the east end of Line 7 station hall, which takes about 2min.
To take the Shanghai maglev train, the nearest exit is Exit 4 at Line 2.
-
Transfer passage between the two station halls of Line 2 & Line 7
-
Transfer passage between the two station halls of Line 2 & Line 7
-
Transfer passage between the two station halls of Line 2 & Line 16
-
A set of escalators mono-directionally upwards, at the transfer passage from Line 18 to Line 16
-
Transfer passage from Line 18 to Line 16 at the elevated part
Incidents
At 11:05 on 26 April 2021, a passenger climbed the passenger edge doors, in an attempt to enter the tunnel of Line 2.
Station staff quickly reacted, however, staff later confirmed the passenger that climbed the door had died.
Services continued from noon that day.
Places nearby
References
- ^ "Longyang Road". Explore Shanghai. Retrieved 2020-09-03.
- ^ 上海市地方志办公室 上海通网站 上海市地情资料库 上海市的百科全书. shtong.gov.cn. Retrieved 13 September 2017.
- ^ 上海市地方志办公室 上海通网站 上海市地情资料库 上海市的百科全书. shtong.gov.cn. Retrieved 13 September 2017.
- ^ 20年迈向世界:珍贵老照片展示上海地铁发展. Eastday (in Chinese). 27 May 2013. Retrieved 14 July 2013.
- ^ "China claims train blue riband". Retrieved 27 December 2014.
- ^ 上海市地方志办公室 上海通网站 上海市地情资料库 上海市的百科全书. shtong.gov.cn. Retrieved 13 September 2017.
- ^ 上海轨道交通南北向骨干线路通车. Xinhua News. 2009-12-05. Archived from the original on 2012-04-24. Retrieved 2018-07-22.
- ^ 11号线二期8月31日起通车试运营 (in Chinese). Shanghai Metro. 2013-08-29. Retrieved 2013-09-01.
- ^ "16号线龙阳路站双休日试点双侧站台交替上下客" (in Simplified Chinese). 上海地铁. 2015-05-25. Archived from the original on 2018-10-20. Retrieved 2018-10-19.
- ^ "16号线3月21日起开行大站车" (in Simplified Chinese). 上海地铁. 2016-03-18. Archived from the original on 2016-04-12. Retrieved 2018-10-19.
- ^ "14号线、18号线一期北段12月30日起开通初期运营,申城轨道交通网831公里、5条全自动线 规模世界第一". 上海地铁官网 (in Chinese (China)). 2021-12-28. Retrieved 2022-01-08.
- ^ "一男子翻越上海地铁2号线站台进入线路 涉事男子已死亡". @新民晚报、@东方网 (in Chinese (China)). 2021-04-26. Archived from the original on 2021-04-28. Retrieved 2021-04-26.
External links
Media related to Longyang Road Station at Wikimedia Commons