Loading
  • 21 Aug, 2019

  • By, Wikipedia

Madian Qiao Station

Madian Qiao station (simplified Chinese: 马甸桥站; traditional Chinese: 馬甸橋站; pinyin: Mǎdiàn Qiáo zhàn) is a station on Line 12 of the Beijing Subway. It opened on December 15, 2024.

Location

The station is located under the North 3rd Ring Road Middle at the intersection of Desheng Outer Gate Street and G6 Beijing–Lhasa Expressway under the east side of Madian Bridge. It is on the border between Desheng Subdistrict in Madian in Haidian District and Huayuan Road Subdistrict in Xicheng District.

Station features

The station has an underground island platform.

Exits

There are 3 exits, lettered A, B and D. Exit B has an accessible elevator. Exit C has not been built yet in the initial opening of the station.

History

The station was formerly named as Madian, which was then proposed to be renamed to "Madian Qiao" on July 21, 2023, according to the announcement of the Beijing Municipal Planning and Nature Commission. On January 3, 2024, the station was officially renamed. It was put into use on December 15, 2024, with the opening of Line 12.

References

  1. ^ 孙宏阳; 李博 (2024-12-12). "官宣!本周日北京新开3条(段)地铁线,朝阳站枢纽同步开通" [Official announcement! Three new subway lines will be opened in Beijing this Sunday, and Chaoyang Station Hub will be opened simultaneously] (in Simplified Chinese). Beijing Daily Client. Archived from the original on 2024-12-13. Retrieved 2025-01-13.{{cite news}}: CS1 maint: multiple names: authors list (link)
  2. ^ 郭祥倩 (2019-01-23). "四"家"服务关爱户外工作者——西城区总工会开展"温暖有你 幸福前行"暖心活动纪实" [Four "homes" of service to care for outdoor workers——Record of the heartwarming activity "Warmth with You, Happiness Moving Forward" carried out by the Xicheng District Federation of Trade Unions]. Labor Lunchtime Report (in Simplified Chinese). p. 09. Archived from the original on 2020-06-25. Retrieved 2025-01-13. Chen Hongxiang, chairman of the Desheng Subdistrict Federation of Trade Unions, came to the construction site of Madian Station on Line 12 of the China Railway No. 2 Engineering Bureau Metro Project Department located southeast of Madian Bridge
  3. ^ "北京西城区德胜街道总工会将爱心饺子送到四公司地铁工地" [The Desheng Subdistrict Federation of Trade Unions in Xicheng District, Beijing, delivered love dumplings to the subway construction site of the Fourth Company] (in Simplified Chinese). China Railway No.2 Group. 2020-01-15. Archived from the original on 2020-06-27. Retrieved 2025-01-13.
  4. ^ "四公司北京地铁12-8标项目一级方案执行简报20200528" [Fourth Company Beijing Metro 12-8 Project Level 1 Plan Implementation Briefing 20200528]. Beijing Subway Line 12 Civil Construction Contract Section 08 Project Management Department (in Simplified Chinese). 2020-05-27. Archived from the original on 2020-06-28. Retrieved 2025-01-13.
  5. ^ 裴剑飞 王贵彬 (2021-06-01). "下穿北三环和京藏高速,地铁12号线马甸站主体结构完工" [Passing under the North Third Ring Road and Beijing-Tibet Expressway, the main structure of Madian Station on Metro Line 12 has been completed] (in Simplified Chinese). Archived from the original on 2024-08-07. Retrieved 2025-01-13. Schematic diagram of the Madian Station project on Line 12. Photo provided by China Railway No. 2 Engineering Group
  6. ^ "地名命名方案公示" [Place name naming plan announcement]. yewu.ghzrzyw.beijing.gov.cn (in Simplified Chinese). Archived from the original on 2023-09-13. Retrieved 2025-01-13.
  7. ^ "地名公告" [place name announcement] (in Simplified Chinese). Beijing Municipal Commission of Planning and Natural Resources. 2023-12-27. Archived from the original on 2023-10-26. Retrieved 2025-01-13.