Moneypoint
Three Brown Boveri four-cylinder, single-shaft impulse reaction turbines are directly connected to three generators which generate the power. The steam is generated by three Foster Wheeler two-pass boilers, which convert water into high pressure steam by combustion of the coal.
The power station chimneys, at 218m, are the tallest free-standing structures in Ireland.
History
Moneypoint was under construction from 1979 to 1987. Before its construction, Ireland depended heavily on imported oil for its energy. The 1970s sharp increase in oil prices over a short period of time led the government and the Electricity Supply Board to choose coal as a fuel, as it was seen as a plentiful resource with a stable price.
A flywheel synchronous condenser to stabilize the grid was ordered for operation at Moneypoint by 2022.
In 2019, the government launched its climate action plan which included a commitment to end the burning of coal in Moneypoint by 2025, and replace coal-fired generation with "low-carbon and renewable technologies". One option being explored is a 400 MW floating wind farm with an onshore hydrogen facility.
The plant was planned to be closed in 2025 but operation was extended to 2029.