Nanyang Gateway MRT Station
History
On 9 May 2018, the Land Transport Authority (LTA) announced that Nanyang Gateway station would be part of the proposed JRL. The station will be constructed as part of Phase 3, consisting of 7 stations – a 4 station extension to Jurong Pier from Boon Lay and a 3 station extension to Peng Kang Hill from Tawas. It was expected to be completed in 2028. However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2029.
The contract for the design and construction of the Nanyang Gateway and Nanyang Crescent stations and 1.4 km (0.87 miles) of associated viaducts – Contract J113 – was awarded to Hwa Seng Builder Pte Ltd at S$263 million (US$192.8 million) on 6 April 2021. Construction is scheduled to start in the second quarter of 2021, with expected completion in 2029.
Station details
The station will serve the JRL and will be located between the Tawas and Nanyang Crescent stations. The official station code will be JW3. The station will span over Nanyang Avenue and has four entrances, serving the NTU Hall of Residence and Staff Residence.
References
- ^ "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". CNA. 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ Lim, Adrian (9 May 2018). "New Jurong Region Line to boost access for NTU students". The Straits Times. Archived from the original on 9 April 2021. Retrieved 9 April 2021.
- ^ "News Room - News Releases - Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West". Land Transport Authority. 9 April 2021. Archived from the original on 9 April 2021. Retrieved 9 April 2021.
- ^ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Archived from the original on 9 April 2021. Retrieved 24 March 2021.
- ^ "Contract J113" (PDF). Land Transport Authority. Archived (PDF) from the original on 9 April 2021. Retrieved 9 April 2021.
- ^ "Two Civil Contracts to Construct Four Stations for the Jurong Region Line Awarded". Land Transport Authority. 6 April 2021. Archived from the original on 6 April 2021. Retrieved 8 April 2021.
- ^ "Future system map" (PDF). Land Transport Authority. Archived (PDF) from the original on 5 April 2021. Retrieved 9 April 2021.
- ^ "JW3 Nanyang Gateway". Land Transport Authority. Archived from the original on 10 April 2021. Retrieved 10 April 2021.