New Lane (Leeds) Railway Station
Whilst originally the preferred station option, a November 2015 review of the phase two route instead proposed that the Leeds HS2 platforms should join onto the side of the existing Leeds station. Unlike New Lane, this would have provided a common concourse for easy interchange between high speed and classic rail services.
Background
In 2009, the Labour Government created High Speed Two Ltd to examine the prospect of further high-speed rail in the United Kingdom. Later in 2010, the Coalition Government confirmed there would be a terminus in both Leeds and Manchester. In January 2013 the final route was announced with a new station being proposed for Leeds and a new station adjacent to Piccadilly station for the terminus in Manchester. Both Leeds and Manchester were to have junctions to the south of the cities allowing for connections to the East Coast Main Line and the West Coast Main Line respectively.
Proposal
Publication of the proposed route on 28 January 2013 showed that the Leeds station would be a new terminus connected to Leeds City station by airport-style pedestrian walkways, possibly with moving walkways.
The configuration and design of the station has not been confirmed. New Lane is quarter of a mile south of Leeds station and is a cul-de-sac in the centre of a gyratory, containing a small business park. There is no railway infrastructure at the site. Previously there were railways to the west with a goods yard at Crown Point (see Leeds Hunslet Lane railway station) and mineral lines to transport coal to Meadow Lane Gas Works.
The site is next to Bridgewater Place and close to Holbeck Urban Village and the M621 motorway.
Proposed facilities
Few details of the proposed facilities have been released, however the Department for Transport have confirmed car parking will be provided to the south of the site. The station will link to Leeds station which has ticket offices, car parks, a bus interchange and two concourses containing retail, restaurant and licensed facilities. There are currently proposals to expand these facilities. With the link this will enable facilities to be shared by the two stations. The plans released appear to show the New Lane site with a sizeable concourse.
Public transport
First Leeds bus routes run around the gyratory and there are stops on Victoria Road and Meadow Lane. Both the formerly proposed Leeds Supertram and Leeds Trolleybus routes would have passed within half a mile of the site.
Location in Leeds and on HS2
The plans show the tracks approaching the station from the south-east, parallel to the Pontefract Line and then the M621, coming through Meadow Lane Gas Works and Leeds City Business Park, with the station on a viaduct which spreads from the centre of the gyratory through the Leeds City Business Park site: the viaduct would extend 290m beyond the station buildings. This would mean the relocation of several businesses, a Leeds City Council depot and a natural gas storage facility consisting of two low-pressure gas holders.
Preceding station | Future services | Following station | ||
---|---|---|---|---|
Meadowhall Interchange | TBA High Speed 2 |
Terminus |
-
The Meadow Lane gas holders are in the path of the development
-
The Leeds City Business Park, also in the path of the development
Withdrawal of preferred status
In November 2015 an interim report on the Leeds HS2 station location was published. This stated that New Lane was no longer the preferred station location, as it would be too detached from the existing Leeds station and too isolated from the city centre. Instead it recommends that a different location for the HS2 platforms be found which shares a common concourse with the existing Leeds station. The suggested location has the platforms connect to the existing station building across the river from the South, creating a 'T' shape.
See also
References
- ^ "Leeds to get new HS2 high-speed rail station". BBC News. 28 January 2013. Retrieved 29 January 2013.
- ^ "Phase Two: Leeds". High Speed Two (HS2) Ltd. January 2013. Retrieved 29 January 2013.
- ^ "The Yorkshire Hub" (PDF). Department for Transport. p. 10. Retrieved 30 November 2015.
- ^ "Second rail station plan for Leeds city centre". Yorkshire Evening Post. 26 January 2013. Retrieved 29 January 2013.
- ^ "City House" (PDF). Bruntwood. p. 10. Retrieved 17 June 2012.
- ^ "Route section HSL22 and HSL31 plan and profile sheet 2 of 2 - drawing number HS2" (PDF). Gov.uk. Retrieved 2 June 2022.
External links
- HS2 website
- Map of the HS2 route from Birmingham to Leeds
- Map showing location of proposed Leeds New Lane Station NB north is at bottom right