Loading
  • 21 Aug, 2019

  • By, Wikipedia

New National Gallery

The Neue Nationalgalerie (New National Gallery) at the Kulturforum is a museum for modern art in Berlin, with its main focus on the 20th century. It is part of the National Gallery of the Berlin State Museums. The museum building and its sculpture gardens were designed by Ludwig Mies van der Rohe and opened on September 15th, 1968.

The gallery closed in 2015 for renovation. The work, by David Chipperfield Architects, was completed in 2021, and the museum reopened in August 2021 with an exhibition of works by American sculptor Alexander Calder.

Architecture

Dimensions, specifications and materials

This interior view of the Neue Nationalgalerie's ground floor shows the play of light off the reflective floor, as well as the animated red LCD tracks on the ceiling.

The plan of the Neue Nationalgalerie is divided into two distinct stories. The upper story serves as an entrance hall as well as the primary special exhibit gallery, totaling 2,683 m (28,880 sq ft) of space. It is elevated from street level and only accessible by three flights of steps. Though it only comprises a small portion of the total gallery space, the exhibition pavilion stands boldly as the building's primary architectural expression. Eight cruciform columns, two on each length placed so as to avoid corners, support a square pre-stressed steel roof plate 1.8 meters (5 ft 11 in) thick and painted black. An 18-meter (59-foot) cantilever allows for ample space between the gallery's glazed façade and eight supporting columns. Mies' office studied this cantilever extensively in various scaled models in order to ensure its structural stability as well as the seeming flatness of the roof plate. The floor-to-ceiling height reaches 8.4 meters (28 ft), and the space is (laid) out on a 3.6-meter (12 ft) square dimensional grid. Black anodized aluminum "egg crates" fit within the grid house lighting fixtures, with air ducts suspended above.

The lower story serves primarily as housing for the gallery's permanent collection, though it also includes a library, offices, and a shop and café, and totals about 10,000 m (110,000 sq ft) of space. It is three-quarters below ground so as to allow for safe storage of the artwork. Its sole glazed façade looks out on the museum's sloping sculpture garden and provides ample indirect interior lighting.

A rooftop plaza further extends the museum's exhibition space.

Contemporaneous projects

In 1956, José M. Bosch, President of Ron Bacardí y Compañía approached Mies to commission the design of a new office space. He was particularly interested in a very open plan, and the relatively simple idea Mies came up with involved a square roof plate supported on each side by two columns. Though initial structural challenges had to be dealt with, the resulting pavilion typology became integral to Mies' architectural lexicon, in many ways the epitome of his universal conception of space.

The Bacardí Building was abandoned in September 1960 due to general political unrest in Cuba, but at the same time, two other museum commissions were brought to Mies' office. Georg Schaefer, a wealthy industrialist living in Schweinfurt approached Mies about the construction of a museum for his nineteenth-century art collection during the summer of 1960. A modest initial plan was drawn for the structure, but later that year Mies decided to reconfigure the unbuilt Bacardí project to fit Schaefer's program as he wished to see it built. Consequently, a scaled-down model of the Bacardí project this time rendered in steel rather than concrete was created. In March 1961, Mies also received a letter from the Senator for Building and Housing in Berlin, inviting him to build what was to be called the Neue Nationalgalerie, an exhibition space for the state's collection of early twentieth-century art. The two museum projects, though slightly different in scale, where to be essentially identical in form, both a version in steel of the original Barcardí design. Though the Schweinfurt project never came to fruition, the reductive exercise of continual reconfiguration allowed for the perfection of Mies' expression in Berlin, and the Neue Nationalgalerie remains as the sole built form of the initial tripartite conception.

Aesthetic importance

Much of Mies' syntactical development throughout the three building progression leading up to the Neue Nationalgalerie was prefigured in an earlier project for a Museum for a Small City. This project was published in a special May 1943 edition of Architectural Forum. In his publication, Mies describes a seemingly floating roof plane, suspended above a single clear-span space punctuated by equidistant columns. This project is now seen as a significant move on Mies' part toward the alleviation of interior space by both defining and minimizing structural enclosure, thus joining exterior and interior space in a meaningful way. The structure itself, a composite of little more than ground plane, support and roof, thus becomes the building. The aesthetic importance of the clear-span was directly related to Mies' conception of museum space in general, a "defining, rather than confining space". The completely open nature of the plan also serves to eliminate the barrier between art and community, simultaneously breaking down the reverence enacted by severely partitioned spaces and inviting interaction between viewer and art. The overall aesthetic affect is thus one of vitalizing liberation. This infinitely transformative capability and universality is also seen in Mies' buildings from the intervening years, namely the Farnsworth House in Plano, Illinois, and Crown Hall of the Illinois Institute of Technology campus. Various commentators have recognized the structure's ties to classical building, seeing it as a modern temple whose monumental simplicity evinces the immense skill behind its design and conception.

Criticism

The ability of clearly articulated external structures to alleviate façades and create large-scale universal spaces required certain boldness on the part of the client. The ineffable expression of the Neue Nationalgalerie's entrance pavilion had certain logistical downsides. Its smooth granite flooring reflects the warm natural light that floods the space, creating hazy shadow and making curatorial efforts notoriously complicated. The singular expression of the pavilion space also relegated the lower story to a secondary position, presenting further difficulties for the display of artwork involving a lack of natural lighting and relatively pedestrian layout of viewing space. When asked later to renovate and expand the building's lower story, Mies refused, as to do so would destroy the perfect proportions of the temple above. He originally conceived of the entrance pavilion as a place for very large works, allowing for unencumbered visual interaction and for use of the piece as space element in itself. An early collage included in the May 1943 Architectural Forum article about Museum for a Small City includes Picasso's Guernica, along with other large, plane-like paintings. Yet smaller works had to be shown on moveable freestanding walls or hanging partitions, making a curator's ability to effectively differentiate spaces difficult.

David Chipperfield renovation

Having had no thorough modernization since its inauguration, the Neue Nationalgalerie required upgrades to its air-conditioning, lighting, security, accessibility, electricity, visitor facilities and the behind-the-scenes infrastructure for moving art. In 2012 it was announced that British architect David Chipperfield would oversee a major renovation of the building. In a non-competitive selection process common for public contracts in Germany, his firm was chosen for the contract out of 24 architectural firms based on a two-stage negotiation process.

Originally planned for €101 million, the €140 million renovation project started in 2015 and was originally expected to last three years, during which time the museum was closed. Original building elements, such as handrails and shelves, were removed, restored and reinstalled in their previous locations. Archival material dating from the construction at the Museum of Modern Art in New York and the Library of Congress in Washington, DC, helped the architects remain true to Mies's design. Meanwhile, the structural framework of the roof, which rests on eight steel beams, and the glass facade was restored.

Collection

The collection features a number of unique highlights of modern 20th-century art. Particularly well represented are Cubism, Expressionism, the Bauhaus and Surrealism. The collection owns masterpieces of artists like Pablo Picasso, Ernst Ludwig Kirchner, Joan Miró, Wassily Kandinsky and Barnett Newman. The design of the building, despite its large size, allows for the display of only a small part of the collection, and the displays are therefore changed at intervals.

Permanent art installations

The Neue Nationalgalerie's ceiling, constructed as a grid of black-painted steel beams, has been used as an exhibit surface in itself for Installation for the Neue Nationalgalerie, an installation of long lines of LCD displays by artist Jenny Holzer in 2001, which continuously scrolled abstract patterns down their length.

The Neue Nationalgalerie's terrace provides a particularly prominent space for large-scale pieces of sculpture from the 20th century. Permanently installed sculptures include Gudari (1957) by Eduardo Chillida, Polis (1968) by Joannis Avramidis, the kinetic metal sculpture Vier Vierecke im Geviert (1969) by George Rickey, Three Way Piece No.2: The Archer (1964–65) by Henry Moore, Têtes et Queue (1965) by Alexander Calder, and Berlin Block Charlie Chaplin (1978) by Richard Serra. In 2003, with the permission of the Barnett Newman Foundation, a fourth edition of the sculpture Broken Obelisk (1963) by Barnett Newman was cast and temporarily installed in front of the museum. In 2011, Thomas Schütte's work Vater Staat (2010) was donated by Nicolas Berggruen and installed on the terrace. Many other pieces of sculpture - by artists from Auguste Renoir to Ulrich Rückriem - are on permanent display in the museum's garden.

Directors

Images

See also

References

  1. ^ Berlin, Staatliche Museen zu. "Staatliche Museen zu Berlin: Profile". Staatliche Museen zu Berlin. Archived from the original on 9 June 2023. Retrieved 23 October 2023.
  2. ^ David Dernie; Jacopo Gaspari (2016). Material Imagination in Architecture. Routledge.
  3. ^ Berlin, Staatliche Museen zu. "Staatliche Museen zu Berlin: Profile". Staatliche Museen zu Berlin. Retrieved 25 October 2023.
  4. ^ "David Chipperfield Architects' renovation of Mies van der Rohe's Neue Nationalgalerie unveiled". Dezeen. 28 December 2020. Archived from the original on 16 July 2021. Retrieved 29 December 2020.
  5. ^ Schuetze, Christopher F. (23 August 2021). "A 6-Year Refit Winds Back the Clock at a Berlin Landmark". The New York Times. ISSN 0362-4331. Archived from the original on 11 April 2022. Retrieved 10 April 2022.
  6. ^ Pica, Agnoldomenico. "Less Is Forever". Domus. Archived from the original on 22 January 2015. Retrieved 9 May 2013.
  7. ^ Lambert 2001, p. 475.
  8. ^ Lambert 2001, p. 488.
  9. ^ Blaser 1982, p. 94.
  10. ^ Lambert 2001, p. 499.
  11. ^ Lambert 2001, p. 489.
  12. ^ Lambert 2001, p. 497.
  13. ^ "New National Gallery". Artifice, Inc. Archived from the original on 11 May 2013. Retrieved 9 May 2013.
  14. ^ Glynn, Simon. "Neue Nationalgalerie (New National Gallery)". Galinsky. Archived from the original on 30 May 2013. Retrieved 9 May 2013.
  15. ^ Lambert 2001, p. 426.
  16. ^ Catherine Hickley (13 August 2021), Mies van der Rohe's landmark Neue Nationalgalerie in Berlin ready for reopening after 'surgery' by David Chipperfield Archived 13 August 2021 at the Wayback Machine The Art Newspaper.
  17. ^ Catherine Hickley (29 March 2012), David Chipperfield to Renovate Berlin's Neue Nationalgalerie Archived 22 January 2015 at the Wayback Machine Bloomberg News.
  18. ^ Catherine Hickley (13 August 2021), Mies van der Rohe's landmark Neue Nationalgalerie in Berlin ready for reopening after 'surgery' by David Chipperfield Archived 13 August 2021 at the Wayback Machine The Art Newspaper.
  19. ^ Catherine Hickley (29 March 2012), David Chipperfield to Renovate Berlin's Neue Nationalgalerie Archived 22 January 2015 at the Wayback Machine Bloomberg News.
  20. ^ Catherine Hickley (13 August 2021), Mies van der Rohe's landmark Neue Nationalgalerie in Berlin ready for reopening after 'surgery' by David Chipperfield Archived 11 April 2022 at the Wayback Machine The Art Newspaper.
  21. ^ Bernhard Schulz (22 January 2015), David Chipperfield promises to keep 'as much Mies as possible' at Neue Nationalgalerie Archived 22 January 2015 at the Wayback Machine The Art Newspaper.
  22. ^ "Neue Nationalgalerie". visitBerlin. Archived from the original on 30 May 2023. Retrieved 23 October 2023.
  23. ^ Thomas Schütte’s ‘Vater Staat’ on the forecourt terrace of the Neue Nationalgalerie, Press Release of July 6, 2011 Archived 18 May 2012 at the Wayback Machine Staatliche Museen zu Berlin.
  24. ^ Neue Nationalgalerie - Collection Archived 27 May 2013 at the Wayback Machine Staatliche Museen zu Berlin.
  25. ^ "Klaus Biesenbach named director of Berlin's Neue Nationalgalerie". 10 September 2021. Archived from the original on 17 July 2023. Retrieved 17 July 2023.

Further reading

  • Joachim Jäger, tr. Geoffrey Steinherz. Neue Nationalgalerie Berlin: Mies van der Rohe. Ostfildern: Hatje Cantz / Berlin: Staatliche Museen zu Berlin, 2011. ISBN 9783775731454
  • Bénédicte Savoy & Philippa Sissis (Hrsg.): Die Berliner Museumsinsel: Impressionen internationaler Besucher (1830–1990). Eine Anthologie. Böhlau, Wien/Köln/Weimar 2012, ISBN 978-3-412-20991-9.
  • Natural stone in the Neue Nationalgalerie