Norðoyatunnilin
History
In 1988 Landsverkfrøðingurin (the national office of public works) carried out a number of seismic investigations in Leirvíksfjørður (the strait between Eysturoy and Borðoy). A year earlier, an engineer had drawn up an overall plan showing alternative sites for constructing tunnels. Further surveys in 1988 confirmed that the tunnel plans were considered to be economically viable. In 2003, after the 1990s Faroese economic crisis, work began on boring the tunnel between Eysturoy and Borðoy. The official opening of the tunnel was on April 29, 2006. Traffic has steadily increased from 662,828 vehicles in 2007 to 1,308,519 in 2019 (3,585 per day). The project cost 395 million Danish kroner and is expected to be repaid by 2021.
See also
References
- ^ "Hagtøl" [Statistics]. tunnil.fo. January–August 2024. Retrieved 24 September 2024.
- ^ "Norðoyartunnilin í tølum". Tunnel.fo (in Faroese). Archived from the original on 2015-10-01.
- ^ "Árlig ferðsla íalt". tunnil.fo. Archived from the original on 2021-01-26.
External links
- UF.fo - "Tunnel to Northern Islands now open for all Traffic" (archived version) (of May 3, 2006)
- Tunnil.fo - Official homepage(in Faroese)
- The opening of Norðoyatunnilin April 29. 2006 (in Danish)
62°12′29″N 6°40′55″W / 62.208°N 6.682°W