Nordsee-Ost Offshore Wind Farm

Nordsee-Ost offshore wind farm is an offshore wind farm in operation in the eastern part of the North Sea German sector. The project was developed by RWE Innogy, a subsidiary of RWE.

The wind farm consists of 48 turbines with a total capacity of 295 MW. The 6.15 MW turbines were provided by REpower. Steel foundations for generators were supplied by Aker Verdal. Power converters were supplied by Woodward Governor Company. A consortium of Siemens and Prysmian built the high-voltage direct current submarine cable from the wind farm to the German transmission system operated by Transpower, a subsidiary of TenneT.

Delays in power line construction by Dutch TenneT delayed its operational start.

On 11 May 2015 the wind farm was officially put into operation.

See also

References

  1. ^ "Nordsee Ost Offshore Wind Farm". 4coffshore.com. Retrieved 2017-03-05.
  2. ^ Backwell, Ben (2010-02-01). "REpower to supply 295MW of turbines for RWE's Nordsee Ost". ReCharge. NHST Media Group. Retrieved 2010-07-17.
  3. ^ "Aker wins deal at Nordsee Ost". ReCharge. NHST Media Group. 2010-06-17. Retrieved 2010-07-17.
  4. ^ "Aker Verdal wins wind project in Germany" (Press release). Aker Solutions. 2010-06-17. Retrieved 2010-07-17.
  5. ^ "Woodward power converters chosen for Nordsee Ost". ReCharge. NHST Media Group. 2010-04-15. Retrieved 2010-07-17.
  6. ^ Backwell, Ben (2010-07-16). "Siemens and Prysmian win €500m Nordsee-Ost wind farm contract". ReCharge. NHST Media Group. Archived from the original on 2012-02-24. Retrieved 2017-03-05.
  7. ^ David Crossland (6 March 2012). "German wind energy plans in the doldrums". thenational.ae. Retrieved 24 June 2015.
  8. ^ "G7-Energieministertreffen in Hamburg". Bundesministerium für Wirtschaft und Energie. 2015-05-11.