Northampton Loop Line
The southern interconnect between the Northampton loop and the direct London–Birmingham main line is at Hanslope Junction, just north of Milton Keynes. The lines continue to run alongside until the two routes diverge north of Roade at the northern end of Roade Cutting. The loop line then runs north east for several miles until it reaches Northampton station. After Northampton, the line heads to the north-west for around twenty miles, until it re-joins the main line at Hillmorton Junction at Rugby, just east of Rugby station.
Services and operations
The majority of passenger services on the line are provided by West Midlands Trains using Class 350 electric multiple units. Class 319 units are used for peak-hour express services between Northampton and London Euston. The service consists of three 'semi fast' trains per hour between London Euston and Birmingham New Street. There is also an hourly local service between Northampton and Birmingham. Prior to December 2012 there was also a service to and from Crewe, but a few serve the loop line during morning and evenings and hourly on Sundays.
Avanti West Coast provide a small number of Class 390 Pendolino services to London at the extremes of the day. But nearly all Avanti West Coast trains use the direct main line. Line speeds on the loop line are currently limited to 75 mph (120 km/h) compared to 125 mph (200 km/h) on the fast line, making the line unattractive to the routing of fast services. As of 2011, line speeds were expected to increase to 90 mph (140 km/h) once signalling improvements are in place north of Northampton up to Rugby.
Long Buckby; the one other station on the line, is served by the London–Birmingham/Northampton–Birmingham services. The London–Crewe service does not stop at Long Buckby except on Sundays.
The line sees heavy freight traffic, as it is used by all freight trains on the southern part of the WCML. Many of these are container trains, with some serving the Daventry International Railfreight Terminal (DIRFT), which is between Northampton and Rugby (thus on the loop line).
History
When the London and Birmingham Railway (L&BR) was constructed in the 1830s, Northampton was by-passed, with the line running on high ground to the west via Kilsby Tunnel. Traditionally, this was said to have been because wealthy Northampton landowners objected to having a railway run through their land to reach the town. However, an alternative view is that Northampton was by-passed because the gradients would have been too steep for the early locomotives of the 1830s to easily cope with. Robert Stephenson the engineer of the London and Birmingham Railway was determined to avoid gradients steeper than 1:330 (that is 1 foot of rising or falling gradient for every 330 feet of distance). As Northampton is located in the Nene Valley, 120 feet (37 metres) lower than Blisworth, the closest point the L&BR came, connecting the town would have required gradients significantly steeper than this.
This meant however that Northampton, despite being a large town, did not have direct rail links to London. A branch from the main line was built to Northampton in the early 1840s: the Northampton and Peterborough Railway, from Blisworth, which gave the town indirect rail links to London and Birmingham.
The successor to the L&BR, the London and North Western Railway (LNWR) decided to construct the loop line through Northampton in the 1870s. It was built as part of a wider scheme to double the capacity of the West Coast Main Line between Bletchley and Rugby, by quadrupling the track; however, routing the additional tracks on a deviation via Northampton had the advantage of giving the town a much better rail service, including a direct service to London, and avoiding the expense of widening Kilsby Tunnel. The LNWR obtained Parliamentary approval for the line in 1875, and commenced construction in 1877. The line was opened for goods throughout on 1 August 1881, for passengers between Rugby and Northampton on 1 December 1881, and for passengers between Northampton and Roade on 3 April 1882. The loop line is a total of 23+3⁄4 miles (38.2 km) long, approximately 2+1⁄4 miles (3.6 km) longer than the direct line.
The loop line made use of the existing but small Northampton Castle railway station which occupied part of the site of the historic Northampton Castle. The station needed to be expanded as part of the works, this required the almost complete demolition of what remained of the Castle to make way for it.
Shortly after the completion of the loop line, the southern approach to Rugby station was remodelled, with a new flying junction built near Hillmorton, which allowed trains from the loop line to run into Rugby station without conflicting with trains on the fast lines.
The line was electrified along with the rest of the WCML during the 1960s in the wake of the BR 1955 Modernisation Plan.
The Daventry International Rail Freight Terminal (DIRFT); a major rail freight interchange, was opened in 1996 with a rail connection to the loop line, and has been expanded several times since.
Stations
The only stations that are currently operational on the route are Northampton and Long Buckby. Previously there were five stations on the loop line, but only these two survive. The three stations closed were:
- Kilsby and Crick (closed 1960)
- Long Buckby
- Althorp Park (closed 1960)
- Church Brampton (closed 1931)
- Northampton
Proposed future development
Warwickshire County Council has proposed a new station on the Northampton Loop Line called Rugby Parkway, which would be on the south-eastern outskirts of Rugby serving the Hillmorton area of the town, and the new housing development at Houlton. The purpose of this would be to accommodate the future expansion of the town. The station was originally planned to open in 2019.
As funding was not secured, this deadline was not met. Nevertheless, in July 2019, Warwickshire County Council's Draft Rail Strategy for 2019-2034 proposed that the station would be opened between 2019 and 2026, with the possibility that at some point additional platforms could be provided on the 'fast' West Coast Main Line lines, in addition to the slow lines via Northampton.
Infrastructure
The Northampton loop starts at the northern end of Roade Cutting. The line is double track and electrified throughout. There are three tunnels on the Northampton loop, the longest of which is Hunsbury Hill Tunnel between Roade and Northampton, which is 1,152 yards (1,053 m) long. There are two shorter tunnels between Long Buckby and Rugby, these are Watford Lodge Tunnel at 115 yards (105 m), and Crick Tunnel at 595 yards (544 m). The line crosses the Pulpit Bridge (or "Armchair Bridge") between Rugby and Long Buckby.
Accidents and incidents
- In January 1906, a young woman, 19 year old Lily Yolande Marie Rochaid, was found dead in Crick Tunnel, having fallen from the train she was travelling on from London to Rugby. A search was called after the train arrived at Rugby and it was noticed that the door of the carriage was open and no-one was inside. The circumstances of her death were never fully explained.
- Two very similar railway accidents occurred on the Northampton loop in 1967 and 1969. The 1967 incident was near the village of Milton Malsor between Roade and Hunsbury Hill tunnel and the other in 1969 near the northern end of Roade cutting.
- On 20 March 1985, the body of 35 year old social worker Janet Maddocks was found beside the line to the north of Northampton station. Jack Roy, aged 15 at the time, was later convicted of murdering her and throwing her from a train.
References
- ^ Elliott, Peter H. (1982). "Rugby's Transport History" (PDF). pp. 128–133. Retrieved 9 November 2021.
- ^ "Current Campaigns & Earlier Successes". Northampton Rail Users Group. 2013. Archived from the original on 18 January 2016.
- ^ Bickerdike, Graeme (1 December 2021). "Stairway to heaven: shaft repairs at Kilsby tunnel". Rail Engineer. Retrieved 5 July 2020.
- ^ "Kilsby Tunnel". Archived from the original on 3 September 2013.
- ^ Kingscott 2008.
- ^ Elliot 1985.
- ^ Gough, John (1984). The Northampton & Harborough Line. Oakham: Railway and Canal Historical Society. p. 63. ISBN 0-901461-35-0.
- ^ "Vision". Railfreight Interchange Investment Group. Retrieved 10 November 2021.
- ^ "Second train station to be built as Rugby expands". Rugby Advertiser. 15 October 2015. Retrieved 23 November 2015.
- ^ "Plans for second Rugby train station on hold due to lack of funds". Rugby Observer. 7 June 2018. Retrieved 8 November 2021.
- ^ "Warwickshire Rail Strategy 2019-2034" (PDF). Warwickshire County Council. p. 25. Retrieved 8 November 2021.
- ^ "Railway tunnel lengths. Locations beginning G-P". railwaycodes.org. Retrieved 19 November 2021.
- ^ "Railway tunnel lengths. Locations beginning Q-Z". railwaycodes.org. Retrieved 19 November 2021.
- ^ "Railway tunnel lengths. Locations beginning A-F". railwaycodes.org. Retrieved 19 November 2021.
- ^ Historic England. "Pulpit Bridge (1404795)". National Heritage List for England. Retrieved 18 April 2024.
- ^ "MYSTERIOUS DEATH OF A PRINCETHORPE GIRL. ANOTHER TUNNEL MYSTERY". The Tablet. Archived from the original on 27 August 2016. Retrieved 21 August 2016.
- ^ Murders, Unsolved (20 January 1906). "Lillie Yolande Marie Rochaid". Unsolvedmurders.co.uk. 3962 (1906). Unsolved Murders. Retrieved 10 November 2021.
- ^ "Her Unfinished Journey The Murder of Mrs Janet Mary Maddocks (1985)". British Transport Police History Group. 19 August 2020. Retrieved 10 November 2021.
- Healy, John M.C. (1989). The Last Days Of Steam In Northamptonshire. ISBN 0-86299-613-9.
- Elliot, Peter H. (1985). Rugby's Railway Heritage. ISBN 0-907917-06-2.
- Kingscott, Geoffrey (2008). Lost Railways Of Northamptonshire. Countryside Books. ISBN 978-1-84674-108-1.