Northeast Corridor Rapid Transit Project
History
Prior to Brightline, a similar project was known as the Coastal Link in the 2010s with Tri-Rail as the prospective operator.
In 2020, it was revealed that Brightline was planning a commuter rail service to complement their existing intercity service. Referred to as the Northeast Corridor, trains would run between MiamiCentral and Aventura with five stations between. Brightline and the Miami-Dade County Commission agreed to access fees in November 2020. The estimated cost for full buildout of the line was $325 million in 2021. Operations were expected to start as early as 2024. By 2023, station locations had been identified and service frequencies for trains were expected to be every 30 to 60 minutes. The price of the project had increased to $588,663,000. As of 2024, the project now has an estimated cost of $927,300,000, with service starting as soon as 2032, as the result of the Federal Transit Administration indicating to "slow down" the pace of the project.
Stations
Location | Station | Connections |
---|---|---|
Ojus | Aventura |
|
North Miami Beach | FIU/Biscayne NE 151st St |
|
North Miami | North Miami NE 123rd St |
|
Miami | NE 61st St Little Haiti |
|
NE 39th St Design District |
||
NE 27th St Wynwood |
||
MiamiCentral |
|
See also
References
- ^ "Miami-Date County Department of Transportation and Public Works (DTPW) Northeast Corridor Rapid Transit Project Fact Sheet" (PDF). miamidade.gov. Archived (PDF) from the original on July 12, 2023.
- ^ "Northeast Corridor". www.miamidade.gov. Retrieved February 2, 2023.
- ^ "Northeast Corridor Fact Sheet (Nov. 2024)" (PDF). miamidade.gov. Retrieved December 8, 2024.
- ^ "Tri-Rail Coastal Link South Florida East Coast Corridor (SFECC) Transit Analysis Study". tri-railcoastallinkstudy.com. Retrieved March 9, 2023.
- ^ "Deal For Brightline To Build Commuter Rail System Nearly Ready". The Next Miami. May 16, 2024. Retrieved May 18, 2024.
- ^ Scheckner, Jesse (March 23, 2021). "After $345 million buildout, Brightline to run new intercity rail". Miami Today. Retrieved April 6, 2021.
- ^ "Brightline, Miami-Dade OK access fee for new commuter-rail system". Progressive Railroading. November 18, 2020. Retrieved November 21, 2020.
- ^ Scheckner, Jesse (April 6, 2021). "Miami-Dade seeks federal funding for Northeast commuter rail line". Miami Today. Retrieved April 11, 2021.
- ^ Hanks, Douglas (February 23, 2023). "A commuter train along U.S. 1 in Miami? County unveils plan without El Portal station". Miami Herald. Retrieved June 1, 2023.
- ^ "Miami-Aventura rail route cost rises quarter billion". Miami Today. September 26, 2023. Retrieved November 8, 2023.
- ^ "Miami To Aventura Train Service Pushed To 2032". The Next Miami. November 13, 2024. Retrieved December 8, 2024.