Ormiston Town Centre
The area is adjacent to Barry Curtis Park, and Te Irirangi Drive.
Development
The shopping centre is part of a 19-hectare development on Auckland Council property near Ormiston Road. In total the centres construction cost a total of $250 million. The shopping centre was constructed to serve the rapidly developing suburb of Flat Bush.
Stage 1 of the development was completed in 2015 creating small retail premises and a supermarket.
Stage 2 introduced a 40,000 m (430,000 sq ft) enclosed shopping centre with over 90 stores and started construction in October 2018. Stage 2 of the centre was scheduled to open in October 2020, however because of constraints linked to the COVID-19 pandemic, it would instead open in March 2021.
Plans
Barry Curtis Park will be further developed to link with the retail centre, which would also feature additional areas for mixed-use development and community centres.
See also
References
- ^ OurAuckland. "Ormiston Town Centre is open for business". OurAuckland. Retrieved 8 December 2022.
- ^ Staff (22 March 2021). "Auckland's newest shopping centre to open". Times. Retrieved 8 December 2022.
- ^ wildlabs (20 August 2020). "Introducing Ormiston Town Centre". Ormiston Town Centre. Retrieved 8 December 2022.
- ^ "Ormiston Town Centre". RCP. Retrieved 8 December 2022.