Oselvar Oil Field
Ownership
DNO Norge AS is since 2019 the formal operator of the field with 55% of interest in the project. Production License 274 which covers the area of the field was given in 2002 to then operator DONG. As per 2020 the only other partner is CapeOmega AS (45%). The total development cost was NOK 4.7 billion. "Dong makes plans for Oselvar find". Upstream Online. NHST Media Group. 2009-03-09. Retrieved 2010-03-25.</ref>
Production
Oselvar was developed with three production wells. Produced oil and gas was transported to the Ula field platform for processing via the Oselvar module. Once processed, the oil was pumped via the Norpipe system to Teesside, UK. Although production was scheduled to start in November 2011, production actually started on April 14, 2012.
See also
References
- ^ "The shelf in 2009 - Development". Norwegian Petroleum Directorate. 2010-01-10. Retrieved 2010-03-25.
- ^ OLJEDIREKTORATET Norwegian Petroleum Directorate. Field: Oselvar
- ^ "Oselvar Field Development Plan Submitted to Norwegian Authorities". Rigzone. 2009-03-09. Retrieved 2010-03-25.
- ^ "DONG sees Oselvar in Ipswich oil find". Scandinavian Oil and Gas Magazine. 2008-08-20. Retrieved 2010-03-25.
- ^ SubSeaIQ. Offshore Field Developments. Oselvar
- ^ "DNO given go-ahead for North Sea Oselvar disposals". Offshore. 2022-01-12. Retrieved 2024-08-31.
- ^ "DONG Energy submits development plan and increases equity in Oselvar". DONG Energy. 2009-03-09. Retrieved 2010-03-25.