Pak Kret Bypass MRT Station
Pak Kret Bypass station (Thai: สถานีเลี่ยงเมืองปากเกร็ด, RTGS: Sathani Liang Mueang Pak Kret) is a Bangkok MRT station on the Pink Line. The station is located on Chaeng Watthana Road, near Pak Kret Bypass Road (Highway 3105) in Pak Kret district, Nonthaburi province. The station has four exits. It opened on 21 November 2023 as part of trial operations on the entire Pink Line.
References