Pakenham Railway Line, Melbourne
The line operates for approximately 20 hours a day (from approximately 4:00 am to around midnight) with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5 to 10 minutes are operated with services every 20 minutes during off-peak hours. Trains on the Pakenham line run with a seven-car formation operated by High Capacity Metro Trains.
Sections of the Pakenham line opened as early as 1859, with the line fully extended to Pakenham in October 1877. A limited number of stations were first opened, with infill stations progressively opened between 1879 and 2012. The line was built to connect Melbourne with the rural towns of Caulfield, Oakleigh, and Dandenong, amongst others. Significant growth has occurred since opening, with an extension to open on the Pakenham line one stop east to a new station in Pakenham East as part of the Level Crossing Removal Project. This extension opened on 3 June 2024.
Since the 2010s, due to the heavily utilised infrastructure of the Pakenham line, significant improvements and upgrades have been made. A $15 billion upgrade of the corridor included the replacement of sleepers, the introduction of new signalling technology, the introduction of new rolling stock, the removal of all level crossings, and works associated with the Metro Tunnel project. These projects have improved the quality and safety of the line and will be completed by the opening of the Metro Tunnel in 2025.
History
19th century
In 1877, the Pakenham line began operations from Oakleigh to Bunyip, as part of the main line to Gippsland. The section from Oakleigh to Flinders Street station was connected at South Yarra in April 1879. In 1877, the Pakenham line began operations from Oakleigh to Bunyip, as part of the single-tracked main line to Gippsland, with an extension of the duplicated section of the line opening in 1881 to Caulfield, Oakleigh in 1883, and Dandenong in 1891. In 1883 the line between Richmond station and South Yarra was quadrupled to accommodate an increase in train services due to the opening of Frankston and Sandringham lines.
In 1885, a number of level crossing removal works occurred between Flinders Street station and South Yarra due to an increase in freight and passenger operations. These crossings were removed through a combination of lowering and raising the corridor.
20th century
In 1915, the line between South Yarra and Caulfield was quadrupled, as part of level crossing removal works. This section of the line was lowered into a cutting to eliminate numerous level crossings. Power signalling was provided between Richmond and Hawksburn at the same time, then on to Caulfield in 1921.
Electrification of the line to Dandenong occurred in two stages during 1922. In May 1922, the section from South Yarra to Oakleigh station was electrified, with the section to Dandenong being electrified later in December 1922. The electrification of the line allowed for the introduction of Swing Door electric multiple unit trains for the first time.
Power signalling was extended to Carnegie in 1933, Oakleigh in 1940, and to Dandenong in stages between 1970 and 1972.
The line between Dandenong, Pakenham and Traralgon was electrified in 1954. Initially single track, duplication of the line between Dandenong, Pakenham and Nar Nar Goon was completed in 1955 and 1956. Suburban services were extended beyond Dandenong to Pakenham in January 1975. Previously, the stations between Dandenong and Pakenham were only served by regional passenger trains connecting Gippsland to Melbourne.
In 1981, Pakenham line services commenced operations through the City Loop, after previously terminating at Flinders or Spencer Street stations. The commencement of operations involved the service stopping at three new stations—Parliament, Melbourne Central (formally Museum), and Flagstaff. The Loop follows La Trobe and Spring Streets along the northern and eastern edges of the Hoddle Grid. The Loop connects with Melbourne's two busiest stations, Flinders Street and Southern Cross, via the elevated Flinders Street Viaduct. From 2025, the Pakenham line will no longer operate through the City Loop, instead operating via the north-south Metro Tunnel corridor.
21st century
In 2002, after the closure of the nearby General Motors factory in 1991, General Motors station closed permanently after 46 years of operation. A 2007 restructure of train ticketing in Melbourne involved the removal of Zone 3, with Zone 3 stations being re-classified to Zone 2. This brought the cost of train fares down, improving system accessibility to the public.
The Pakenham line received heavy investment during the 2010s to align with the 2013 PTV Development Plan. A new station at Cardinia Road opened in 2012 situated between Officer and Pakenham stations. This is the first infill station to open on the line since 1927, with an additional station at Pakenham East expected to open in 2024 in conjunction with level crossing removal works. In 2018, the Pakenham East Depot opened for the newly acquired High Capacity Metro Trains. This depot has stabling capacity for 30 seven-car trains with train maintenance, driver training, and washing facilities present onsite.
Announced in 2021, the Pakenham line was extended one stop east to East Pakenham. The extension involved the removal of the Main Street and Racecourse Road level crossings, the elevation of Pakenham station, the construction of a new station at East Pakenham and other associated safety and landscape works. These works were undertaken as part of the Level Crossing Removal Project. The rebuilt Pakenham and East Pakenham opened on 3 June 2024.
Route
Pakenham line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Pakenham line forms a relatively linear route from the Melbourne central business district to its terminus in Pakenham. The route is 57 kilometres (35 mi) long and is predominantly doubled tracked, however between Flinders Street and Richmond, the corridor is widened to 12 tracks, narrowing to six tracks between Richmond and South Yarra before again narrowing to four tracks between South Yarra and Caulfield. After Caulfield station, the corridor again narrows to two tracks for the rest of the route. The only underground section of the Pakenham line is in the City Loop, where the service stops at 3 underground stations. Exiting the city, the Pakenham line traverses mainly flat country with few curves and fairly minimal earthworks for most of the line. However, between South Yarra and Malvern, the rail corridor has been lowered into a cutting to eliminate level crossings, and between Malvern and Caulfield, the corridor has been raised on an embankment for the same reason. After Caulfield, the line formerly had numerous level crossings, however, all have now been removed between Caulfield and Dandenong as part of an elevated rail project, as well as some older bridges over and under roads. Remaining level crossings between Dandenong and Pakenham stations will be removed by 2025 under smaller level crossing removal works.
The line follows the same alignment as the Cranbourne line with the two services splitting onto different routes at Dandenong. The Pakenham line continues on its eastern alignment, whereas the Cranbourne line takes a southerly alignment towards its final destination of Cranbourne station. Most of the rail line goes through built-up suburbs and some industrial areas, but after Dandenong, the line passes through more open countryside, including open fields and farms, particularly after Beaconsfield. This outer portion of the line is one of Melbourne's main growth corridors, where farmland is being replaced with housing and commercial developments, leading to a rise in patronage.
Stations
The line serves 28 stations across 57 kilometres (35 mi) of track. The stations are a mix of elevated, lowered, underground, and ground level designs. Underground stations are present only in the City Loop, with the majority of elevated and lowered stations being constructed as part of the Level Crossing Removal Project. From 2025, services will cease to stop at Flinders Street, Southern Cross, Flagstaff, Melbourne Central, Parliament, Richmond and South Yarra stations due to the opening of the Metro Tunnel. From March-June 2024, Narre Warren and Pakenham stations were elevated as part of Level Crossing Removal Project. Once the Metro Tunnel has been constructed, the Pakenham and Cranbourne line will be routed through to Sunbury.
Station | Image | Accessibility | Opened | Terrain | Train connections | Other connections |
---|---|---|---|---|---|---|
Flinders Street | Yes—step free access | 1854 | Lowered | |||
Southern Cross | 1859 | Ground level | 27 connections
|
|||
Flagstaff | 1985 | Underground | ||||
Melbourne Central | 1981 | |||||
Parliament | 1983 | |||||
Richmond | No—steep ramp | 1859 | Elevated | |||
South Yarra | 1860 | Lowered |
3 connections |
|||
Malvern | 1879 |
2 connections | ||||
Caulfield | Ground level |
3 connections |
||||
Carnegie | Yes—step free access | Elevated |
1 connection |
|||
Murrumbeena | ||||||
Hughesdale | 1925 | |||||
Oakleigh | 1877 | Ground level | ||||
Huntingdale | No—steep ramp | 1927 | ||||
Clayton | Yes—step free access | 1880 | Elevated |
2 connections | ||
Westall | 1951 | Ground level |
1 connection | |||
Springvale | 1880 | Lowered | ||||
Sandown Park | No—steep ramp | 1888 | Ground level | |||
Noble Park | Yes—step free access | 1913 | Elevated | |||
Yarraman | No—steep ramp | 1976 | Ground level | |||
Dandenong | 1877 |
2 connections |
||||
Hallam | Yes—step free access | 1880 | Elevated | |||
Narre Warren | 1882 | Ground level | ||||
Berwick | 1877 |
1 connection | ||||
Beaconsfield | No—steep ramp | 1879 | ||||
Officer | Yes—step free access | 1881 | ||||
Cardinia Road | 2012 | |||||
Pakenham | 1877 |
1 connection |
||||
East Pakenham | 2024 |
Station | Opened | Closed | Age | Notes |
---|---|---|---|---|
Flinders Street | 12 September 1854 | 170 years |
| |
Southern Cross | 17 January 1859 | 165 years |
| |
Flagstaff | 27 May 1985 | 39 years |
| |
Melbourne Central | 26 January 1981 | 43 years |
| |
Parliament | 22 January 1983 | 41 years |
| |
Princes Bridge | 8 February 1859 | 1 October 1866 | 7 years | |
2 April 1879 | 30 June 1980 | 101 years | ||
Botanic Gardens | 2 March 1859 | c. April 1862 | Approx. 3 years | |
Punt Road | 8 February 1859 | 12 December 1859 | 10 months |
|
Richmond | 12 December 1859 | 164 years |
| |
Cremorne | 12 December 1859 | c. 28 December 1863 | Approx. 4 years | |
South Yarra | 22 December 1860 | 163 years |
| |
Hawksburn | 7 May 1889 | 135 years |
| |
Toorak | 7 May 1879 | 145 years |
| |
Armadale | 7 May 1879 | 145 years |
| |
Malvern | 7 May 1879 | 145 years | ||
Caulfield | 7 May 1879 | 145 years | ||
Carnegie | 14 May 1879 | 145 years |
| |
Murrumbeena | 14 May 1879 | 145 years | ||
Hughesdale | 28 February 1925 | 99 years | ||
Oakleigh | 8 October 1877 | 147 years | ||
Huntingdale | 25 June 1927 | 97 years |
| |
Clayton | 6 January 1880 | 144 years |
| |
Westall | 6 February 1951 | 73 years | ||
APEX Siding (Westall) | ? | – |
| |
Springvale | 1 September 1880 | 144 years |
| |
Sandown Park | c. December 1888 | 15 May 1955 | Approx. 66 years |
|
19 June 1965 | 59 years | |||
Noble Park | 3 February 1913 | 111 years | ||
Yarraman | 21 December 1976 | 47 years | ||
Dandenong | 8 October 1877 | 147 years | ||
General Motors | 1 October 1956 | 28 July 2002 | 45 years | |
Hallam | 1 December 1880 | 143 years |
| |
Narre Warren | 10 March 1882 | 142 years | ||
Berwick | 8 October 1877 | 147 years | ||
Beaconsfield | 1 December 1879 | 144 years | ||
Hargraves Siding | ? | ? | ||
Officer | 4 August 1881 | 143 years |
| |
Cardinia Road | 22 April 2012 | 12 years | ||
Pakenham | 8 October 1877 | 147 years | ||
East Pakenham | 3 June 2024 | 5 months |
Planned stations
Station | Accessibility | Expected opening | Terrain | Planned train connections | Other planned connections | Notes |
---|---|---|---|---|---|---|
Arden | Yes - Step Free Access | 2025 | Underground |
2 connections |
Opening as part of the Metro tunnel project in 2025 | |
Parkville | ||||||
State Library | ||||||
Town Hall | ||||||
Anzac |
Services
Services on the Pakenham line operates from approximately 4:00 am to around 11:30 daily. In general, during peak hours, train frequency is 5 minutes on the Dandenong corridor (combined with the Cranbourne line) and 10 minutes in the AM peak on the Pakenham Line while during non-peak hours the frequency is reduced to 20–30 minutes throughout the entire route. Services run anticlockwise through the City Loop, and from 2025, Pakenham line services will cease to stop at South Yarra, Richmond, and all City Loop stations when trains are rerouted through the Metro Tunnel upon opening. On Friday nights and weekends, services run 24 hours a day, with 60 minute frequencies available outside of normal operating hours. Since 13 February 2022, some off-peak daytime Pakenham and Cranbourne line services stop at Malvern station, running express between South Yarra and Malvern stations.
Train services on the Pakenham line are also subjected to maintenance and renewal works, usually on selected Fridays and Saturdays. Shuttle bus services are provided throughout the duration of works for affected commuters.
Stopping patterns
Legend — Station status
- ◼ Premium Station – Station staffed from first to last train
- ◻ Host Station – Usually staffed during morning peak, however this can vary for different stations on the network.
Legend — Stopping patterns
Some services do not operate via the City Loop
- ● – All trains stop
- ◐ – Some services do not stop
- ▲ – Only inbound trains stop (trains operate counter-clockwise through the city loop all day)
- ▼ – Only outbound trains stop
- | – Trains pass and do not stop
Pakenham Services | ||||||||
---|---|---|---|---|---|---|---|---|
Station | Zone | Local | Ltd Express | Westall | Dandenong | Morning Shuttle | Weekday Shuttle | |
◼ Flinders Street | 1 | ● | ● | ● | ● | |||
◼ Southern Cross | ▲ | ▲ | ▲ | ▲ | ||||
◼ Flagstaff | ▲ | ▲ | ▲ | ▲ | ||||
◼ Melbourne Central | ▲ | ▲ | ▲ | ▲ | ||||
◼ Parliament | ▲ | ▲ | ▲ | ▲ | ||||
◼ Richmond | ● | ● | ● | ● | ||||
◼ South Yarra | ● | ● | ● | ● | ||||
◻ Malvern | ◐ | | | | | | | ||||
◼ Caulfield | ● | ● | ● | ● | ||||
◼ Carnegie | ● | ● | ● | ● | ||||
◼ Murrumbeena | ● | ● | ● | ● | ||||
◻ Hughesdale | 1/2 | ● | ● | ● | ● | |||
◼ Oakleigh | ● | ● | ● | ● | ||||
◻ Huntingdale | ● | ● | ● | ● | ||||
◼ Clayton | 2 | ● | ● | ● | ● | |||
◼ Westall | ● | | | ● | ● | ||||
◼ Springvale | ● | ● | ● | ▼ | ||||
Sandown Park | ● | ● | ● | ▼ | ||||
◼ Noble Park | ● | ● | ● | ▼ | ||||
Yarraman | ● | | | ● | ▼ | ||||
◼ Dandenong | ● | ● | ● | ▼ | ● | |||
Hallam | ● | ● | ▼ | ● | ||||
◼ Narre Warren | ● | ● | ▼ | ● | ||||
◼ Berwick | ● | ● | ▼ | ● | ||||
Beaconsfield | ● | ● | ▼ | ● | ||||
Officer | ● | ● | ▼ | ● | ||||
Cardinia Road | ● | ● | ▼ | ● | ||||
◼ Pakenham | ● | ● | ▼ | ● | ||||
◼ East Pakenham | ● | ● | ▼ | ● |
Operators
The Pakenham line has had a total of 7 operators since its opening in 1877. The majority of operations throughout its history have been government run: from its first service in 1877 until the 1999 privatisation of Melbourne's rail network, four different government operators have run the line. These operators, Victorian Railways, the Metropolitan Transit Authority, the Public Transport Corporation and Bayside Trains have a combined operational length of 122 years.
Bayside Trains was privatised in August 1999 and later rebranded M>Train. In 2002, M>Train was placed into receivership and the state government regained ownership of the line, with KPMG appointed as receivers to operate M>Train on behalf of the state government. Two years later, rival train operator Connex Melbourne took over the M>Train operations including the Pakenham line. Metro Trains Melbourne, the current private operator, then took over the operations in 2009. The private operators have had a combined operational period of 25 years.
Operator | Assumed operations | Ceased operations | Length of operations |
---|---|---|---|
Victorian Railways | 1877 | 1983 | 106 years |
Metropolitan Transit Authority | 1983 | 1989 | 6 years |
Public Transport Corporation | 1989 | 1998 | 9 years |
Bayside Trains (government operator) | 1998 | 1999 | 1 years |
M>Train | 1999 | 2004 | 5 years |
Connex Melbourne | 2004 | 2009 | 5 years |
Metro Trains Melbourne | 2009 | incumbent | 14 years (ongoing) |
Infrastructure
Rolling stock
The Pakenham line uses a fleet of electric multiple unit (EMU) High Capacity Metro Trains operating in a seven-car configuration, with three doors per side on each carriage and can accommodate of up to 1,380 passengers in each train-set. Shared with the Cranbourne, Sunbury, and Airport lines, the rolling stock will consist of 70 High Capacity Metro Trains (HCMT), once fully delivered. They are built in Changchun, China, with final assembly occurring in Newport, Melbourne, by Evolution Rail, a consortium composed of CRRC Changchun Railway Vehicles, Downer Rail and Plenary Group.
Previously, the Pakenham line was served by a fleet of Comeng and Siemens Nexas trains. The oldest Comeng trains (stage 1 and some stage 2) have been retired and scrapped as part of the HCMT introduction, however, some of these trains have been displaced onto other Melbourne metropolitan lines. In comparison, the Siemens Nexas trains have not been retired, instead being moved onto other lines to replace older Comeng sets. Since the end of 2022, the Pakenham line is almost exclusively operated by High Capacity Metro Trains.
Alongside the passenger trains, Pakenham line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation. Most of these trains are repurposed locomotives previously used by V/Line, Metro Trains, and the Southern Shorthaul Railroad.
Depot
This section needs expansion with: information about the different types of depots (driver, maintenance, and stabling) if the article could qualify for FA status. You can help by adding to it. (May 2023) |
Rolling stock on the Pakenham line is primarily served by the Pakenham East Depot located in the outer suburb of Pakenham East. This depot was built in 2018 to exclusively house and maintain 30 brand new High Capacity Metro Trains while they are out of service. Built by evolution rail the 118 hectares (290 acres) depot consists of a stabbling yard and an advanced driver training simulator.
The depot is one of the most sustainable train maintenance regimes in Australia with:
- Energy savings of 23%
- Water savings of 46%
- 77% of water recycled
- 13% enchanment of biodiversity
- 115,000 kilograms (254,000 lb) of carbon saved every year
Signalling
Since the mid to late 20th century, the Pakenham line has used a fixed block three position signalling system designed for lower frequencies and less services. However, the ageing system had undermined reliability due to the presence of system faults and limited frequencies, requiring the Pakenham, Cranbourne, and Sunbury lines to upgrade their signalling system. Since 2021, high-capacity signalling (HCS) has been rolling out on the Pakenham, Cranbourne, and Sunbury lines, allowing trains to safely run closer together and run more frequently. The new system is being delivered by CPB Contractors and Bombardier Transportation under the Rail Systems Alliance. These works valued at $1 billion includes the roll-out of 55 kilometres (34 mi) of HCS and communications systems on the aforementioned lines, allowing an increase in reliability and frequency. The line will be equipped with Bombardier’s CityFlo 650 communications-based train control system, that will enable operation at 2–3 minute headways.
The upgrading works were completed in phases from 2021. With the upgraded signalling system, trains are now able to run closer to each other. The new system was tested on the Mernda line and a section of the Cranbourne line before being fully implemented on the lines. In March 2022, the Pakenham line underwent further testing of high-tech signalling equipment, to ensure the new trains and signalling system can safely run alongside older-generation trains—including freight and V/Line trains—and the existing signalling system.
Stations facilities
Customer service
All premium railway stations on the Pakenham line have customer service centres that are open from the first to the last service. Host stations on the line also have customer service centres, however these are only staffed for a few hours during the morning peak.
At the service centres, passengers can:
- Buy tickets (Myki)
- Pick up timetables
- Collect change for vending machines and payphones
Accessibility
In compliance with the Disability Discrimination Act of 1992, all stations that are new-built or rebuilt are fully accessible and comply with these guidelines. The majority of stations on the corridor are fully accessible, however, there are some stations that haven't been upgraded to meet these guidelines. These stations do feature ramps, however, they have a gradient greater than 1 in 14. Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts. These stations typically also feature tactile boarding indicators, independent boarding ramps, wheelchair accessible myki barriers, hearing loops, and widened paths.
Projects improving station accessibility have included the Level Crossing Removal Project that involves station rebuilds and upgrades, individual station upgrade projects, and associated Metro Tunnel works. These works have made significant strides in improving network accessibility, with more than 60% of Pakenham line stations classed as fully accessible. This number is expected to grow within the coming years, as a network restructure associated with the opening of the Metro Tunnel is completed and level crossing removal works are completed on the corridor by 2025.
Passenger information displays
Most stations on the Pakenham line are equipped with passenger information displays which provide real time departure information. These displays are owned by Public Transport Victoria and are managed by Metro Trains Melbourne. With the exception of the five central stations, most stations on the network are equipped with 2 line LED displays. However, since 2016 these are being replaced by flat screen displays that additionally show every station the train will serve.
Future
Metro Tunnel
The 2012 Network Development Plan identified the need for a north-south tunnel connecting the Cranbourne and Pakenham lines to the Sunbury line. In 2017, the Metro Tunnel began construction, involving the construction of five new underground stations, twin 9-kilometre (5.6 mi) tunnels, and other associated infrastructure improvements. Leaving the existing Pakenham line alignment before South Yarra station, new stations will be built at Anzac, Town Hall (with connections to Flinders Street), State Library (with connections to Melbourne Central), Parkville, and Arden, before continuing onto the Sunbury line. These works will be completed by 2025, and upon completion, will create a singular rail line from Cranbourne and Pakenham to Sunbury and Melbourne Airport (from 2029).
Melbourne Airport rail link
The Melbourne Airport rail link will involve the construction of a 27-kilometre (17 mi) line from Sunshine to a new station at Melbourne Airport. Connected via the Metro Tunnel, services will operate from the Cranbourne and Pakenham lines through the tunnel before splitting off at Sunshine to either Sunbury or Melbourne Airport. Construction of the line will involve the renovation of Sunshine station to allow for additional platforms, construction of new track, and the addition of two new stations at Keilor East and Melbourne Airport. Construction started in 2022 with services expected to begin in 2029.
Level crossing removals
The Level Crossing Removal Project has announced the removal of all 22 remaining level crossings on the Pakenham line, to be completed in stages from 2018 to 2025. All level crossings between Caulfield and Dandenong were removed in 2018 as part of the Caulfield to Dandenong skyrail project. This included the removal of nine level crossings and the reconstruction of five elevated stations along the corridor. The second phase of removals involves removing individual crossings along the corridor through a variety of methods by 2025. Some crossings have been removed through elevating the rail corridor, some by lowering or raising the road, with other crossings being removed by closing the crossing off from motor traffic. These projects will leave the entirety of the Pakenham line level crossing free by 2025, with projects on the Sunbury line leaving the entire Sunshine-Dandenong corridor crossing free by the opening of the Metro Tunnel in 2025.
References
- ^ "Metro's paper timetables mess". Daniel Bowen. 3 September 2017. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
- ^ "Pakenham Line Timetable". Public Transport Victoria. Archived from the original on 7 September 2018. Retrieved 9 January 2023.
- ^ "High Capacity Metro Trains Project, Victoria, Australia". Railway Technology. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
- ^ "What year did your railway station open? | Public Transport Users Association (Victoria, Australia)". Archived from the original on 9 December 2022. Retrieved 9 December 2022.
- ^ Victoria's Big Build (18 February 2021). "New Pakenham East station location announced and 3 more sets of boom gates to go". Victoria’s Big Build. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
- ^ "Stations to open 3 June". Pakenham Gazette. 10 May 2024. Retrieved 10 May 2024.
- ^ "Level Crossing-Free Pakenham Line Another Step Closer". Archived from the original on 9 December 2022. Retrieved 9 December 2022.
- ^ Victoria's Big Build (28 November 2022). "About the Metro Tunnel Project". Victoria’s Big Build. Archived from the original on 7 December 2022. Retrieved 9 December 2022.
- ^ "Bunyip Railway History". Bunyip Historical Society. 22 November 2018. Archived from the original on 25 October 2022. Retrieved 11 January 2023.
- ^ "Opening Of The Oakleigh Railway". Weekly Times. 5 April 1879. p. 16. Archived from the original on 24 January 2023. Retrieved 9 January 2023.
- ^ "Victorian Heritage Database place details. Former South Yarra Railway Station". 9 January 2023. Archived from the original on 9 January 2023. Retrieved 9 January 2023.
- ^ Woodcock, Ian; Stone, John (2016). "The Benefits Of Level Crossing Removals. Lessons from Melbourne's historical experience" (PDF). p. 18. Archived (PDF) from the original on 9 January 2023. Retrieved 9 January 2023.
- ^ Fisher, Peter (2007). Victorian Signalling: by Accident or Design?. Australian Railway Historical Society (Victorian Division). ISBN 978-1-920892-50-0
- ^ "Report upon the Application of electric traction to the Melbourne suburban railway system". Trove. Archived from the original on 24 January 2023. Retrieved 20 December 2022.
- ^ "More Melburnians could hop on a train or tram every 10 minutes under ambitious Greens proposal". ABC News. 22 August 2022. Archived from the original on 17 December 2022. Retrieved 18 December 2022.
- ^ S.E. Dornan and R.G. Henderson: (1979) The Electric Railways of Victoria
- ^ "Newsrail Volume 3 1975". Newsrail.
- ^ "Improved Suburban Services". Newsrail. Australian Railway Historical Society. February 1975. p. 33.
- ^ "Trove". trove.nla.gov.au. Archived from the original on 14 January 2023. Retrieved 14 January 2023.
- ^ "City Loop closure". Public Transport Victoria. Archived from the original on 14 January 2023. Retrieved 14 January 2023.
- ^ "Guide to navigating the City Loop | Public Transport Users Association (Victoria, Australia)". Archived from the original on 12 December 2022. Retrieved 14 January 2023.
- ^ Townsend, Mellissa (20 April 2015). "No plans for run down General Motors train station at Dandenong South". Herald Sun. Archived from the original on 25 March 2018. Retrieved 4 June 2019.
- ^ Moynihan, Stephen (3 March 2007). "No more Zone 3 lifts load on commuters". The Age. Archived from the original on 29 December 2022. Retrieved 29 December 2022.
- ^ Victoria's Big Build (25 October 2022). "Main Street, Pakenham". Victoria’s Big Build. Archived from the original on 9 December 2022. Retrieved 11 December 2022.
- ^ "High Capacity Metro Trains Project, Victoria, Australia". Railway Technology. Archived from the original on 9 December 2022. Retrieved 19 December 2022.
- ^ "Level crossings gone, new stations open". Pakenham Gazette. Star News Group Pty Ltd. 3 June 2024. Archived from the original on 3 June 2024. Retrieved 3 June 2024.
- ^ Carey, Adam (4 June 2015). "Multimillion-dollar Richmond railway station revamp in limbo". The Age. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
- ^ "Guide to navigating the City Loop | Public Transport Users Association (Victoria, Australia)". Archived from the original on 12 December 2022. Retrieved 12 December 2022.
- ^ Wong, Marcus (10 May 2021). "Level crossing removals in 1920s Melbourne". Waking up in Geelong. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
- ^ "Sky train project for Melbourne's busiest rail line gets go-ahead". ABC News. 6 February 2016. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
- ^ Wray, Tyson. "Melbourne's train lines definitively ranked from best to worst". Time Out Melbourne. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
- ^ Hui, Jin (2 December 2020). "Big train gain: Pakenham line extended". Pakenham Gazette. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
- ^ Lee, Robert S. (2007). The railways of Victoria 1854–2004. Rosemary Annable, Donald S. Garden. Carlton, Vic.: Melbourne University Publishing. ISBN 978-0-522-85134-2. OCLC 224727085. Archived from the original on 8 May 2022. Retrieved 29 December 2022.
- ^ "Caulfield to Dandenong Railway & Linear Park". ASPECT Studios. Archived from the original on 29 December 2022. Retrieved 29 December 2022.
- ^ "What year did your railway station open? | Public Transport Users Association (Victoria, Australia)". Archived from the original on 9 December 2022. Retrieved 9 December 2022.
- ^ Anderson, Rick (2010). Stopping All Stations. Clunes, Victoria: Full Parallel Productions. ISBN 978-0646543635. OCLC 671303814.
- ^ "Stations to open 3 June". Pakenham Gazette. 10 May 2024. Retrieved 10 May 2024.
- ^ "New timetable train line information – Public Transport Victoria". 1 March 2021. Archived from the original on 1 March 2021. Retrieved 18 December 2022.
- ^ "Melbourne Weekend Night Network Train Map" (PDF). 2022. Archived (PDF) from the original on 12 January 2023. Retrieved 18 December 2022.
- ^ "Timetable changes on the Cranbourne Line". Public Transport Victoria. Archived from the original on 9 February 2022. Retrieved 9 February 2022.
- ^ "Where do train replacement buses come from?". ABC News. 15 November 2016. Archived from the original on 14 December 2022. Retrieved 18 December 2022.
- ^ "Pakenham Line". Public Transport Victoria. Archived from the original on 29 November 2022. Retrieved 26 December 2022.
- ^ "Melbourne's Rail Network to be Split" Railway Digest November 1997 page 12
- ^ National Express walks out of Australian rail service The Daily Telegraph (London) 17 December 2002
- ^ Receivers take over train, tram group The Age 24 December 2002
- ^ Victorian passenger services get new managers Rail Express 28 January 2003
- ^ Cooper, Mex (25 June 2009). "New train, tram operators for Melbourne". The Age. Archived from the original on 1 January 2023. Retrieved 1 January 2023.
- ^ "High Capacity Metro Trains". Archived from the original on 8 March 2020. Retrieved 2 January 2022.
- ^ Galloway, Anthony (24 August 2016). "Alarm over Chinese trains".
- ^ "Comeng trains starting to be scrapped". Daniel Bowen. 17 October 2021. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
- ^ Victorian Government Department of Transport and Planning (2023). "New train and tram orders". Archived from the original on 1 December 2021. Retrieved 9 January 2023.
- ^ "NETWORK SERVICE PLAN | Addenda". 1 February 2011. Archived from the original on 7 March 2011.
- ^ "Facilities (Pakenham East Depot)". Evolution Rail. Retrieved 13 April 2023.
- ^ "East Pakenham Train Maintenance Depot, Melbourne, VIC". ACO Infrastructure. Retrieved 13 April 2023.
- ^ "Pakenham East Depot" (PDF). Downer Rail. Retrieved 13 April 2023.
- ^ Victoria's Big Build (18 March 2022). "High Capacity Signalling". Victoria’s Big Build. Archived from the original on 13 December 2022. Retrieved 13 December 2022.
- ^ "Victoria awards Melbourne Metro high-capacity signalling contract". Railway PRO. 19 July 2017. Archived from the original on 13 December 2022. Retrieved 13 December 2022.
- ^ Victoria's Big Build (18 March 2022). "Testing on the Mernda line". Victoria’s Big Build. Archived from the original on 13 December 2022. Retrieved 13 December 2022.
- ^ Mirage News (24 December 2021). "Upgrades to bring more trains more often". Mirage News. Archived from the original on 24 January 2023. Retrieved 13 December 2022.
- ^ "Staffed stations". Public Transport Victoria. Retrieved 13 April 2023.
- ^ "Customer Charter" (PDF). Metro Trains Melbourne.
- ^ "Accessibility – Public Transport Ombudsman Victoria". www.ptovic.com.au. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
- ^ "Station accessibility features". Metro Trains Melbourne. 2023. Archived from the original on 8 December 2022. Retrieved 3 January 2023.
- ^ "Accessing public transport". City of Melbourne. n.d. Archived from the original on 6 December 2022. Retrieved 3 January 2023.
- ^ "Left behind: the fight for accessible public transport in Victoria". the Guardian. 12 June 2022. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
- ^ Victoria’s Big Build (17 October 2022). "Urban design framework". Victoria’s Big Build. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
- ^ "Growing Our Rail Network 2018–2025". Public Transport Victoria. Archived from the original on 12 August 2019. Retrieved 3 January 2023.
- ^ "Digital tools". Public Transport Victoria. Retrieved 16 April 2023.
- ^ "Passenger Information Displays (PIDs) at stations are evolving". Daniel Bowen. 15 October 2018. Retrieved 16 April 2023.
- ^ "Growing Our Rail Network 2018–2025". Public Transport Victoria. Archived from the original on 12 August 2019. Retrieved 11 December 2022.
- ^ Victoria's Big Build (30 October 2022). "Melbourne Airport Rail overview". Victoria’s Big Build. Archived from the original on 5 January 2023. Retrieved 11 December 2022.
- ^ Victoria's Big Build (8 October 2022). "Melbourne Airport Rail timeline". Victoria’s Big Build. Archived from the original on 11 December 2022. Retrieved 11 December 2022.
- ^ "Caulfield to Dandenong skyrail nears completion". Daniel Bowen. 18 March 2018. Archived from the original on 11 December 2022. Retrieved 11 December 2022.
- ^ "Caulfield to Dandenong (Skyrail) | Level Crossing Removal". Ecodynamics | Commercial Landscaping | Greening & Nurturing Our Communities. Archived from the original on 11 December 2022. Retrieved 11 December 2022.
- ^ "Pakenham Level Crossing Removals One Step Closer" (PDF). 27 July 2022. Archived (PDF) from the original on 24 January 2023. Retrieved 11 December 2022.
- ^ Cardinia Shire Council. "LXRP – Level Crossing Removal Project in Cardinia Shire". www.cardinia.vic.gov.au. Archived from the original on 11 December 2022. Retrieved 11 December 2022.
- ^ O'Keane, Tom (6 January 2022). "Contact awarded for $844M Melbourne rail works". Roads & Infrastructure Magazine. Archived from the original on 11 December 2022. Retrieved 11 December 2022.
External links
- Pakenham line timetable
- Network map
- Media related to Pakenham railway line at Wikimedia Commons
- Railway lines in Melbourne
- Railway lines opened in 1877
- 5 ft 3 in gauge railways in Australia
- 1879 establishments in Australia
- Transport in the City of Stonnington
- Transport in the City of Glen Eira
- Transport in the City of Monash
- Transport in the City of Kingston (Victoria)
- Transport in the City of Greater Dandenong
- Transport in the City of Casey
- Transport in the Shire of Cardinia
- Public transport routes in the City of Melbourne (LGA)
- 1500 V DC railway electrification