Phan Thiet Airport
History
By 2017, Binh Thuan People's Committee proposed to upgrade Phan Thiet 4C Airport to level 4E, runway from 2,400 m to 3,050 m in length to be able to exploit international flights in the future. One year later, the project approved by the Prime Minister is one of 15 domestic airports in the country with a 4E grade civilian airport combined with level 1 military airport.
On 5 April 2021, Phan Thiet airport project in Thien Nghiep commune resumed for construction by the Vietnam's Ministry of Defense, the project will be completed by the end of 2022. Phan Thiet Airport was approved by the Prime Minister in 2009, covering 543 hectares. It was started in early 2015 and expected to be completed in 2018, but then stopped.
Construction of the airport resumed on April 5th 2021. On July 29th 2024, the 920th Air Training Regiment of the Air Force Officer's College has successfully finished moving all of its Iak-52 trainer aircraft from its old base at Cam Ranh International Airport to the new base at airport. Before that, on July 17th, the 920th Regiment, together with the 918th Transport Regiment, conducted a series of calibration flights to test out equipment at the airport. It is confirmed that the 920th Regiment will operate Yak-52s and T-6 Texan IIs at the airport.
References
- ^ "Sân bay Phan Thiết sẽ khai thác đầu năm 2024". vnexpress.net (in Vietnamese). Retrieved 8 August 2023.
- ^ "Vietnam starts work on first private-backed airport in Phan Thiet". www.thanhniennews.com. Thanhnien News. January 19, 2015. Archived from the original on January 21, 2015. Retrieved 2016-07-27.
- ^ "Thi công sân bay Phan Thiết".
- ^ https://www.youtube.com/watch?v=KvMcN68-5qE&t
- ^ https://baobinhthuan.com.vn/trung-doan-920-truong-si-quan-khong-quan-bay-chuyen-san-thanh-cong-tu-san-bay-cam-ranh-den-san-bay-phan-thiet-122740.html
- ^ https://dantri.com.vn/xa-hoi/san-bay-phan-thiet-da-bay-quan-su-dan-su-dang-dieu-chinh-chu-truong-dau-tu-20240810160104483.htm
- ^ https://www.youtube.com/watch?v=YswyY4v78dU