Port Of Arinaga
It was not until the later part of the 19th century when the construction of a small harbor in order to facilitate the agricultural exports of the southern part of the island was proposed. Works initiated following the 1917 crisis during World War I and, in 1927, an expansion was commissioned, although it would not take place at the time. Later in the 20th century a mammoth project that would make the port bigger than Las Palmas' was ultimately shelved in the 1970s.
An offshore wind turbine was installed in the harbor, and, in 2013, it broke the national record in Spain for electric production in a single generator, reaching 118,05 MWh.
It is operated by the Port Authority of Las Palmas . As of 2020, its activity focuses on the handling of solid bulk.
References
- Citations
- ^ "Arinaga consolida su futuro, un puerto con proyectos que transforman su realidad". Canarias7. 28 February 2018.
- ^ González Rodríguez 1996, p. 198.
- ^ González Rodríguez 1996, p. 199.
- ^ González Rodríguez 1996, pp. 199–200.
- ^ "El aerogenerador de Arinaga bate el récord de generación eléctrica". eldiario.es. 8 November 2013.
- ^ Fernández, Silvia (21 May 2020). "El tráfico portuario se hunde en Lanzarote y Fuerteventura mientras La Luz aguanta". Canarias7.
- Bibliography
- González Rodríguez, Ángel Víctor (1996). "El Puerto de Arinaga" (PDF). Boletín Millares Carlo (15). Las Palmas de Gran Canaria: Universidad Nacional de Educación a Distancia: 197–204. ISSN 0211-2140.