Haiwen Bridge (Chinese: 海文大桥) (named Puqian Bridge while under construction) is a cable-stayed bridge located east of Haikou City, Hainan, China. It crosses the mouth of Dongzhai Harbor and was built to provide quicker access between Haikou and Wenchang, a large, administrative division of Hainan province. (The area of Wenchang contains the city of Wenchang further south.) The bridge reduced travel time from Haikou to Wenchang from 90 minutes down to around 20 minutes.

Location

The eastern end of the bridge terminates at the town of Puqian. The western end has abutments on, and crosses over, a small island named Beigang Island. It then terminates on the western side of the mouth of Dongzhai Harbor. There, it connects to the nearly complete Jiangdong Avenue (江东大道) which runs west to connect to the Haikou New East Bridge and to start of Haidian No. 5 East Road which leads through Xinbu Island and into Haidian Island, part of Haikou City. Haiwen Bridge effectively connects the east side of the Dongzhai Harbor to Haikou.

Construction

Main pylon

Haiwen Bridge is a single-pylon, double-plane, steel box girder, cable-stayed bridge. The entire length of the bridge is 3959 metres long and 37.3 metres wide. The main span consists two, 230-metre sections, one on each side of the pylon. The deck is steel with a flat, closed box cross section 37.3 metres wide and 3.3 metres deep. The surface contains a two-way, six-lane road.

Resistance to earthquakes

The abutments are designed to handle considerable sway

Because Haiwen Bridge crosses over a geological fault line, it is built to withstand earthquakes. The area was devastated by the 1605 Qiongshan earthquake.

Records

Haiwen Bridge is the biggest single-tower, double-cable-plane, steel box girder cable-stayed bridge in Hainan.

As of 2018, compared to any other bridge in China, this bridge has the best seismic resistance fortification, is designed to resist the highest winds, and is the only cross-sea type bridge that is built over seismic faults. It is also a first in employing a continuous steel box, across-fault, girder structural system, as well as having the biggest domestic steel pipe foundation, which comprises thirty-two steel pipe composite piles, each one having a diameter of 4.3 metres.

Timeline

Construction of Haiwen Bridge began on March 7, 2015. The bridge opened on March 18, 2019. The estimated cost is 3.01 billion Renminbi ($440 million).

See also

References

  1. ^ "Haiwen Bridge". Structurae. Retrieved 24 February 2023.
  2. ^ 陈子琰. "Hainan's Puqian bridge setting records - USA - Chinadaily.com.cn". usa.chinadaily.com.cn.
  3. ^ "海南铺前跨海大桥开工建设 海口到文昌铺前车程将缩短不到半小时_原创_聚焦海口_海口网".
  4. ^ 崔灿. "China's strongest earthquake-resistant bridge to be completed this year- China.org.cn". www.china.org.cn.
  5. ^ "China Communications construction company Ltd.-Business Update". en.ccccltd.cn.
  6. ^ Zhu, Ledong; Zhou, Qi; Ding, Quanshun; Xu, Ziran (2018). "Identification and application of six-component aerodynamic admittance functions of a closed-box bridge deck". Journal of Wind Engineering and Industrial Aerodynamics. 172: 268–279. doi:10.1016/j.jweia.2017.11.002.
  7. ^ 崔灿. "China's strongest earthquake-resistant bridge to be completed this year- China.org.cn". www.china.org.cn.
  8. ^ 周欣. "Cross-sea Haiwen Bridge officially starts operation in S China's Hainan - Xinhua | English.news.cn". www.xinhuanet.com. Archived from the original on March 20, 2019. Retrieved 2021-08-04.