Purley Oaks Railway Station
The ticket office (staffed for part of the day) is on the island platform with two self-service ticket machines in the subway beneath the station.
A short walk away from Purley Oaks is Sanderstead railway station, also in Zone 6, with services to Victoria and East Grinstead.
History
The station was opened by the London Brighton and South Coast Railway on 5 November 1899 as part of the improvements to the main line and the opening of the Quarry Line.
Platform 1 was gutted by fire in 1989, destroying Croydon Model Railway Society's clubrooms.
Services
All services at Purley Oaks are operated by Southern using Class 377 EMUs.
The typical off-peak service in trains per hour is:
- 2 tph to London Bridge (non-stop from Norwood Junction)
- 2 tph to Caterham and Tattenham Corner, dividing and attaching at Purley
There is one morning service from Gatwick Airport, which runs to London Victoria.
On Sundays, there is a half-hourly service between London Bridge and Caterham only. Passengers for Tattenham Corner have to change at Purley.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Southern Stopping Services |
References
- ^ "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
- ^ Yonge, John (November 2008) [1994]. Jacobs, Gerald (ed.). Railway Track Diagrams 5: Southern & TfL (3rd ed.). Bradford on Avon: Trackmaps. map 14C. ISBN 978-0-9549866-4-3.
- ^ "Croydon Model Rail Society: About Us". Croydon Model Rail Society. Archived from the original on 3 August 2020. Retrieved 28 November 2019.
- ^ Table 181 National Rail timetable, May 2022
External links
- Train times and station information for Purley Oaks railway station from National Rail