Red Rock Dam (Iowa)
The dam consists of a rolled earthfill embankment and a gravity concrete control section. The dam, at crest elevation of 797 feet (243 m) above mean sea level, is about 5,200 feet (1,600 m) long and 95 feet (29 m) high above the flood plain. A compacted impervious cutoff trench to bedrock and a grout curtain in the rock are provided for underseepage control.
It was constructed along with Saylorville Dam as a flood control project by the US Army Corps of Engineers, Rock Island District. Major flooding occurred in 1851, 1859, 1903, 1944, 1947, and 1954. In 1960, the Corps began construction. The project was completed in 1969 at a cost of $88 million. The Army Corps maintains its local offices in Knoxville.
In 2014, work started to retrofit the dam to provide hydro-electric power. At a capacity of 36.4 MW it is estimated that annual energy produced by the project will be 178,000 MWh, or enough to power approximately 18,000 homes. The primary purpose of the dam will remain to manage flood control.
Extensive recreational development along the lakeshore rapidly followed.
It was a key location in the 1972 movie A Thief in the Night and its 1978 sequel A Distant Thunder. Lake Red Rock was named after one of the lost towns under the reservoir, Red Rock.
The dam was supposed to take 3 years to fill but it was filled in 5 days to max capacity due to the prevented flood of 1969.
See also
References
- ^ Article title
- ^ "Red Rock Flood Damage Reduction". www.mvr.usace.army.mil. Archived from the original on 2002-01-31.
- ^ http://redrockhydroproject.com/
External links
- U.S. Army Corps of Engineers - Lake Red Rock
- Red Rock Lake - Recreation.gov, recreation and parks information, camping reservations
- Water Levels and Releases (U.S. Army Corps of Engineers) Archived 2018-06-26 at the Wayback Machine
- Red Rock Lake Hydropower Project Website
- Iowa Department of Natural Resources (DNR)