Riverway Station
The station is located on a street running segment of the E branch; trains run in mixed traffic rather than a dedicated median. The station has no platforms; riders wait on the sidewalks (shared with bus stops for the route 39 bus) and cross the street to reach trains. Because of this, the station is not accessible.
In 2021, the MBTA indicated plans to modify the Heath Street–Brigham Circle section of the E branch with accessible platforms to replace the existing non-accessible stopping locations. The new platforms are planned to be long enough to accommodate two 110-foot (34 m) Type 10 vehicles. Design work began in July 2023. Platforms will be built at Riverway and Mission Park. As of December 2024, design work is expected to be completed in late 2026, with construction taking place in 2027–2029.
References
- ^ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
- ^ "Riverway Station Neighborhood Map" (PDF). Massachusetts Bay Transportation Authority. July 2012.
- ^ Peña, Angel (June 21, 2021). "Green Line Transformation (GLT) Update" (PDF). Massachusetts Bay Transportation Authority. p. 7.
- ^ "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. p. 5.
- ^ "Accessibility Initiatives—June 2024" (PDF). Massachusetts Bay Transportation Authority. June 25, 2024. p. 5.