SS James Caldwell
Construction
James Caldwell was laid down on 8 August 1942, under a Maritime Commission (MARCOM) contract, MCE hull 915, by the Bethlehem-Fairfield Shipyard, Baltimore, Maryland; she was sponsored by Mrs. W.G. Esmond, the wife of the chief naval architect for MARCOM, in Washington DC, and was launched on 19 September 1942.
History
She was allocated to A.H. Bull & Co., Inc., on 26 September 1942. On 15 December 1948, she was laid up in the National Defense Reserve Fleet, Beaumont, Texas. On 28 June 1952, she was laid up in the National Defense Reserve Fleet, Mobile, Alabama. On 2 December 1974, she was transferred to the state of Mississippi for use as an artificial reef. She was removed from the fleet on 17 December 1974. She was scuttled off Horn Island, at 30°09′59″N 88°45′13″W / 30.16639°N 88.75361°W in 1976.
References
- ^ Bethlehem-Fairfield Shipyards 2008.
- ^ MARCOM.
- ^ Davies 2004, p. 23.
- ^ MARAD.
Bibliography
- "Bethlehem-Fairfield, Baltimore MD". www.ShipbuildingHistory.com. 14 August 2008. Retrieved 6 March 2020.
- Maritime Administration. "James Caldwell". Ship History Database Vessel Status Card. U.S. Department of Transportation, Maritime Administration. Retrieved 6 March 2020.
- Davies, James (May 2004). "Specifications (As-Built)" (PDF). p. 23. Retrieved 6 March 2020.
- "SS James Caldwell". Retrieved 6 March 2020.