Sanriku-kita Jūkan Road
Route description
As of March 2019, the expressway consists of three sections, one that bypasses the central part of Hachinohe, Aomori and the other traveling north from the central part of Kuji, Iwate. The southernmost of these begins at the northern terminus of the Sanriku Expressway in Miyako. It passes through the town of Iwaizumi and then enters the village Tanohata where it comes to a temporary end at the parallel Route 45. Further north the expressway has another section, entirely within Tanohata, measuring just over four kilometers long. Continuing north along Route 45 the expressway begins again in the village, of Fudai. Like the previous section, it is located entirely within the limits of the village, measuring just over four kilometers long before it rejoins the parallel Route 45. The northern terminus of the route when it is to be completed is located at an interchange with Japan National Route 395 in Kuji that presently only serves the Hachinohe-Kuji Expressway.
Future
The expressway is expected to be completed between Tanohata and Fudai by 2020 as part of a region-wide recovery effort from the 2011 Tōhoku earthquake and tsunami.
Junction list
The entire expressway is in Iwate Prefecture.
Location | km | mi | Exit | Name | Destinations | Notes | |
---|---|---|---|---|---|---|---|
Miyako | 248.1 | 154.2 | 53 | Tarō-kita | Sanriku Expressway National Route 45 | Northbound exit, southbound entrance; southern terminus of Sanriku-kita Jūkan Road, E45 continues south as the Sanriku Expressway | |
Iwaizumi | 252.0 | 156.6 | 54 | Iwaizumi-minami | National Route 45 | Northbound entrance, southbound exit | |
254.1 | 157.9 | 55 | Iwaizumiryūsendō | National Route 455 to National Route 45 | |||
Tanohata | 258.8 | 160.8 | 56 | Unosudangai | Unnamed road – to National Route 45, Unosu Cliff | ||
260.3 | 161.7 | 57 | Tanohata-minami | National Route 45 | |||
266.5– 269.2 | 165.6– 167.3 | Okanyo Tunnel | |||||
265.1 | 164.7 | 58 | Tanohata-chuo | National Route 45 | |||
270.8 | 168.3 | 59 | Tanohata-kita | National Route 45 | Northbound entrance, southbound exit | ||
Fudai | 280.7 | 174.4 | 60 | Fudai | Iwate Prefecture Route 44 – to National Route 45, Central Fudai, Kitayamazaki Cliffs, | ||
285.3 | 177.3 | 61 | Fudai-kita | National Route 45 | Northbound exit, southbound entrance | ||
Noda | 296.0 | 183.9 | 62 | Noda | Iwate Prefectural Road 29 | ||
Kuji | 300.6 | 186.8 | 63 | Kuji-Ube | National Route 45 | Northbound exit, southbound entrance | |
304.8 | 189.4 | 64 | Kuji-minami | National Route 45 | Northbound entrance, southbound exit | ||
308.0 | 191.4 | 65 | Kuji | Hachinohe-Kuji Expressway National Route 45 / National Route 395 – Miyako, Kuji, Ōfunato, Kesennuma | Northern terminus of the Sanriku-kita Jūkan Road, E45 continues north as the Hachinohe-Kuji Expressway | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ^ "Japan's Expressway Numbering System". www.mlit.go.jp. Retrieved 22 March 2019.
- ^ "洋野階上道路" ["Opening prospects for reconstruction roads and reconstruction support roads are "approximately 90% finalized""] (PDF) (pdf) (in Japanese). 28 October 2016. Retrieved 22 March 2019.
External links
- Media related to Category:Sanriku-Kita Road at Wikimedia Commons
- Ministry of Land, Infrastructure and Transport: Tohoku Regional Development Bureau (in Japanese)