Santo Ovídio Station (Porto Metro)
Santo Ovídio station opened, along with the extension of line D from its previous terminus at D. João II , on 15 October 2011. It served as the terminus of line D until 28 June 2024, when the line was further extended to Vila d'Este. Plans were announced in 2022 to build a new line of the Porto Metro (line H) to connect Santo Ovídio to Casa da Música on lines A, B, C, E and F. The construction is planned to start by the end of 2023 and to be completed by the end of 2026.
The station is preceded by D. João II and followed by Manuel Leão . To the north of Santo Ovídio, towards Porto, trains run every 5 to 6 minutes, declining to every 10 minutes on weekends and evenings. Alternate trains from the north still terminate at Santo Ovídio, meaning that towards Vila d'Este trains run every 10 to 12 minutes, declining to every 20 minutes on weekends and evenings.
The underground station has two tracks, served by two side platforms. Access to the street is by a stairs, escalators, lifts and ramps.
References
- ^ Schwandl, Robert. "UrbanRail.Net > Europe > Porto > Porto Metro". Archived from the original on 4 December 2024. Retrieved 4 December 2024.
- ^ "História" [History] (in European Portuguese). Metro do Porto, SA. Archived from the original on 4 December 2024. Retrieved 4 December 2024.
- ^ "Linha Rubi" [Ruby Line] (in Portuguese). Metro do Porto. Archived from the original on 6 December 2024. Retrieved 6 December 2024.
- ^ "Porto light rail extension agreed as expansion plan announced". Metro Report International. Railway Gazette Group. 31 October 2023. Archived from the original on 8 December 2023. Retrieved 6 December 2024.
- ^ "Frequencies" (PDF). Metro do Porto, SA. Archived (PDF) from the original on 26 December 2024. Retrieved 26 December 2024.