Scalby Mills Railway Station
The station has operated continuously as the northern terminus except briefly during the construction of the Scarborough Sealife Centre, when the preceding Beach station formed a temporary terminus.
The station features two platforms, either side of a single island platform concourse, together with a run-round (loco-release) track. These three lines meet at the southern end of the station in a series of points, whilst at the northern end they merge at a turntable, which is also the headshunt for locomotive release.
The station features a signal box, which is currently in use as a general storage facility. There is also a booking office at the turntable end of the station. There are plans to develop a small museum and exhibition centre at the station, outlining the history of the railway for visitors.
References
- ^ "About Us". North Bay Railway Company Ltd. 23 June 2008. Archived from the original on 24 July 2008.
Preceding station | Heritage railways | Following station | ||
---|---|---|---|---|
Beach | North Bay Railway | Terminus |
54°18′03″N 0°24′39″W / 54.300889°N 0.410890°W