Scrivener Dam is a concrete gravity dam that impounds the Molonglo River in Canberra, Australian Capital Territory. The dam creates Lake Burley Griffin, which was established for recreational and ornamental purposes. Named in honour of surveyor Charles Scrivener, the dam was officially inaugurated on 20 September 1963 (1963-09-20) and the official filling of the lake commemorated on 17 October 1964 (1964-10-17) by the Prime Minister, Robert Menzies.

The dam wall is located on Lady Denman Drive and is adjacent to the National Zoo & Aquarium and a viewing area for the official residence of the Governor-General of Australia.

Technical details

Dam wall shown with water flowing out three of the five floodgates. Spectators are gathered on the viewing area on the top of the wall watching the water flow past.
Scrivener Dam with three open fish belly floodgates, 2010

Scrivener Dam, designed in Germany, holds back the waters of the Molonglo River within Lake Burley Griffin. About 55,000 cubic metres (1,900,000 cu ft) of concrete was used in the construction of the dam wall. The dam is 33 metres (108 ft) high and 319 metres (1,047 ft) long with a maximum wall thickness of 19.7 metres (65 ft). The dam is designed to handle a once in 5,000 year flood event.

It utilised state-of-the-art post-tensioning techniques to cope with any problems or movements in the riverbed.

The dam has five bay spillways controlled by 30.5 metres (100 ft) wide, hydraulically operated fish-belly flap gates. Hinge anchors support the flap gates; with six hinges per gate, and four anchors per hinge. The fish-belly gates allow for a precise control of water level, reducing the dead area on the banks between high and low water levels. As at November 2010, the five gates have only been opened simultaneously once in the dam's history, during heavy flooding in 1976.

The dam wall provides a crossing for the lake and consists of a roadway, called Lady Denman Drive, and a bicycle path. The roadway was possible because the dam gates are closed by pushing up from below, unlike most previous designs that wherein the gates were lifted from above.

Dam maintenance

Floating maintenance barrier for Scrivener Dam stored at Yarramundi Reach Lake Burley Griffin Canberra

The National Capital Authority, a statutory authority of the Australian Government, is responsible for the administration and oversight of Scrivener Dam, as the dam lies within the Designated Area, under the Australian Capital Territory (Planning and Land Management) Act, 1988 (Cth). The Authority manages external contractors to deliver services that are competitively tendered.

A routine annual audit of the dam wall undertaken during 2011 revealed that the anchor bolts, which are part of the flap gate hinge mechanism, showed signs of corrosion. These bolts, of which there are 120 in total, are each 50 millimetres (2.0 in) in diameter and 2 metres (6 ft 7 in) long. It was anticipated that work would be completed by the end of 2013, and cost A$20m.

Flood mitigation

Scrivener Dam is operated in an environment that minimises flooding of the environs of Lake Burley Griffin. Flows of 2,000 m/s (71,000 cu ft/s) and above at the dam spillway are achieved with all five flap gates open and are able to maintain the normal level of the Lake at 555.93 metres (1,823.9 ft), measured at the East Basin. With three sluice valves open, outflows of 55 m/s (1,900 cu ft/s) can be achieved through either automatic or manual operation of the dam. A minimum base flow of 0.03 m/s (1.1 cu ft/s) is required in the Molonglo River, downstream of Scrivener Dam at the gauging station below Coppins Crossing.

History

Lights of the dam at night

Lake filling

A prolonged drought coincided with and eased work on the lake's construction. The valves on the Scrivener Dam were closed on 20 September 1963 by Interior Minister Gordon Freeth; Prime Minister Menzies was absent due to ill health. Several months on, with no rain in sight, mosquito-infested pools of water were the only visible sign of the lake filling. With the eventual breaking of the drought and several days of heavy rain, the lake filled, and reached the planned level on 29 April 1964.

On 17 October 1964, Menzies commemorated the filling of the lake and the completion of stage one with an opening ceremony amid the backdrop of sailing craft. This was accompanied by fireworks display, and Griffin's lake had finally come to fruition after five decades, at the cost of A$5,039,050.

The dam, together with Lake Burley Griffin and adjacent lands, is listed on the Register of the National Estate, a listing of places of significant natural and cultural heritage. Since 2012, the register has frozen.

See also