Songjiazhuang Station
On December 30, 2012, Phase 2 Section 1 of Line 10 opened, passing through Songjiazhuang Station, making Songjiazhuang Station the 3rd 3-way transfer station of Beijing Subway (The first two being Xizhimen Station and Dongzhimen Station).
The Yizhuang Line has three platforms employing the spanish solution. For the Yizhuang Line departing passengers use the middle platform, whereas the arriving passengers disembark to the side platforms.
Station layout
The entire station is underground. Line 5 has 2 side platforms. Line 10 has dual-island platforms with a single track between the 2 platforms. The Yizhuang line also has dual-island platforms, using the spanish solution.
With 10 platforms and 7 tracks, the station places first on the amount of platforms and second (to Xingong station) on the amount of tracks throughout the entire Beijing Subway.
Exits
There are 9 exits, lettered A, B, C, D, E, F, G, H, and I. Exit G is accessible.
Gallery
-
Line 10 platform (July 2013)
-
Yizhuang line platform
-
Residence mural
-
Line 5 platform
-
Concourse (July 2013)
-
Concourse (February 2021)
-
Line 10 counter-clockwise platform
-
Line 5 alighting platform
-
Yizhuang line west alighting platform
References
- ^ 北京地铁10号线"O"了 客流破170万. Renmin. Retrieved 2013-05-09.
External links
- Media related to Songjiazhuang Station at Wikimedia Commons
39°50′45″N 116°25′42″E / 39.845849°N 116.428368°E