Loading
  • 21 Aug, 2019

  • By, Wikipedia

South End Circle Metro Station

South End Circle is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving the Basavanagudi area of Bangalore, India. It was opened to the public on 18 June 2017.

Station layout

South End Circle track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Jayanagar
Platform 1
Northbound
Towards ← Nagasandra
Next Station: Lalbagh
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

  1. ^ "Nagasandra-Puttenahalli Metro line to open by May-end, says KJ George". The Times of India. 3 May 2017. Retrieved 2 July 2017.