Southborough Station (MBTA)
History
A station at Southborough (later called Southville) was in use by 1838. The station was rebuilt in 1852, and a new station at Cordaville was added. Service to both stations lasted until 1960.
In 1994, service to Worcester was restored as mitigation for delays with reopening the Old Colony Lines. Service initially ran nonstop from Framingham to Worcester, but intermediate park and ride stops were added later as mitigation for delays in reopening the Greenbush Line. After the opening of Grafton in 2000 caused traffic congestion in the town, officials from Ashland, Southborough, and Westborough asked that their three stations open within a 90-day span to avoid overwhelming any one town with traffic. The three stations, which together cost $14.2 million, were originally scheduled to open on December 31, 2001. However, they were delayed by several factors, including a debate on whether to build full-length high-level platforms. Those were ruled out because they interfere with freight traffic; instead, smaller "mini-high" platforms plus long low platforms were built. Southborough and Westborough opened on June 22, 2002, followed by Ashland on August 24.
A shuttle service connecting the station with two locations in Marlborough began on September 16, 2019.
References
- ^ Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
- ^ Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
- ^ Dickinson, S.N. (1838). The Boston Almanac for the Year 1838. p. 49.
- ^ Report of the Directors of the Boston and Worcester Railroad. Boston and Worcester Railroad. 1853. p. 7.
- ^ Flanagan, Ted (October 16, 2001). "They'll wait for the stations a little longer". Boston Globe. p. 28 – via Newspapers.com.
- ^ Saltzman, Jonathan (June 16, 2002). "Hear that whistle blowin'". Boston Globe. pp. 148, 150 – via Newspapers.com. (second page)
- ^ Saltzman, Jonathan (August 11, 2002). "New stations popular with commuters: Town's rail stop will open Aug. 24". Boston Globe. p. 111 – via Newspapers.com.
- ^ "Free shuttle service to MBTA to launch next month" (Press release). Marlborough Economic Development Corporation. August 27, 2019.
External links
Media related to Southborough station (MBTA) at Wikimedia Commons