Srinagarind Dam
Background
Feasibility studies for the dam were carried out between May 1967 and May 1969 and designs from September 1970 to December 1977. Construction began in 1974 and it was completed in 1980. The first of the dam's generators was commissioned in 1980 and the last in 1991. The original cost of the dam was estimated to be US$45 million but because the dam was constructed on a fault line, the dam's foundation had to be reinforced which raised the cost to US$114 million.
Design
The Srinagarind Dam is a 140 metres (460 ft) tall and 610 metres (2,000 ft) long embankment dam. It contains a reservoir with a capacity of 17,745 million cubic metres (14.386×10 acre⋅ft). The dam's power station has an installed capacity of 720 MW and contains three 120 megawatts (160,000 hp) Francis turbines and two 180 MW Francis pump-turbines. The pump-turbines serve the dam's pumped-storage capability and generate electricity during peak hours. In off-peak hours, the pump turbines return water from the lower reservoir back into the upper reservoir.
See also
References
- ^ "SRINAGARIND (BAN CHAO NEN) Thailand" (PDF). JPower. Retrieved 6 March 2011.
- ^ "Hydroelectric Power Plants in Thailand". Industcards. Retrieved 6 March 2011.
- ^ "The Salween Under Threat" (PDF). Living River Siam. p. 29. Retrieved 6 March 2011.
- ^ "Srinagarind Dam". Electricity Generating Authority of Thailand (EGAT). Retrieved 14 November 2016.