Stade De Luxembourg
Design and construction
The stadium's design was drawn up by local architectural firm Beng Architectes Associés in conjunction with the Hamburg-based Gerkan, Marg and Partners, and selected from a total of 25 submissions by Luxembourg's Minister of Sport and the Mayor of Luxembourg City in September 2014. The final design and construction plans were approved by a unanimous vote of Luxembourg City councillors on 5 December 2016.
Initial ground works on the stadium began in March 2017, with construction work commencing on 21 August 2017, and an official ground breaking ceremony in the presence of Mayor Lydie Polfer held on 18 September 2017. Works were due to be completed by October 2019, with an estimated cost, at the beginning of construction, of 61.1 million euros, with 40 million euros to be covered by the Ministry of Sport, and the rest by the Luxembourg City municipality. However, due to construction delays, the stadium's completion was initially put back until 2020, before finally being completed in July 2021. Construction costs were revised up to approximately 80 million euros, with the Luxembourg City administration paying for the overrun.
Specifications
Due to its location alongside the A6 motorway, the stadium is situated along an east–west axis, in place of the more traditional north–south axis used for stadia. The stadium is designed to hold a capacity of 9,386 spectators with fully covered seating for sporting events, and can hold up to 15,000 spectators for concerts. The main grandstand is situated along the south side of the field. To cope with its dual purpose as a football and rugby venue, as well as hosting occasional concerts, the stadium is equipped with a hybrid grass playing surface.
Name
The name of the stadium was revealed as the "Stade de Luxembourg" at a press conference in July 2020. In September 2020, the Luxembourg Chamber of Deputies rejected a petition to amend the name using the Luxembourgish language after it failed to gather the minimum amount of required signatures.
Public transit
Since the completion of the Cloche d'Or branch of Luxembourg City's new tramline in July 2024, the stadium is served by the "Stadion" tram terminus.
A 2,000-space park and ride car park is located next to the stadium's Route d'Esch entrance.
See also
- Luxembourg national football team
- Luxembourg national rugby union team
- Sport in Luxembourg
- Stade Josy Barthel
References
- ^ "Luxembourg: National stadium in more detail". stadiumdb.com. 25 November 2016. Retrieved 31 December 2019.
- ^ Arellano, Gaël (3 April 2019). "Le nouveau stade national ne portera le nom d'aucun sponsor" [The new national stadium will not carry a sponsor's name]. 5minutes.rtl.lu (in French). Retrieved 31 December 2019.
- ^ Dimitrova, Aseniya (18 July 2020). "The new national stadium of Luxembourg nears completion". www.themayor.eu. Retrieved 13 December 2020.
- ^ Kater, Monique (11 July 2021). "Stade de Luxembourg: First impressions from inside the new Luxembourg City stadium". today.rtl.lu. Retrieved 14 August 2021.
- ^ "Stade de Luxembourg stages first event". The Stadium Business. 16 July 2021. Retrieved 14 August 2021.
- ^ "Futur stade national : la construction votée à l'unanimité" [Future national stadium : unanimous vote to begin construction]. Le Quotidien (in French). 6 December 2016. Retrieved 1 January 2020.
- ^ "Le nouveau stade et son P&R se préparent déjà" [Preparations on the new national stadium and its P&R have already begun]. L'essentiel (in French). 1 March 2017. Retrieved 1 January 2020.
- ^ "Luxembourg : les travaux du nouveau stade commenceront le 21 août" [Luxembourg : work on the new stadium to begin on 21 August]. Le Quotidien (in French). 17 July 2017. Retrieved 1 January 2020.
- ^ "Lancement officiel: Le terrain du futur stade national prend forme" [Official launch: The grounds of the future national stadium begin to take shape]. Wort.lu (in French). 19 September 2017. Retrieved 1 January 2020.
- ^ Labro, Thierry (17 December 2019). "Les travaux du parking du stade national en septembre" [Works on the national stadium's parking facilities to begin in September]. paperjam.lu (in French). Retrieved 1 January 2020.
- ^ Elsen, Frank (13 September 2019). "Money pit: Errors in the construction of new football and rugby stadium". today.rtl.lu. Retrieved 31 December 2019.
- ^ "Design: Stade National de Luxembourg". stadiumdb.com. Retrieved 1 January 2020.
- ^ "First "Stade de Luxembourg" match in March 2021". Delano. 17 July 2020. Retrieved 13 December 2020.
- ^ Renauld, Eddy (16 September 2020). "Le nom du stade national fait toujours débat" [The name of the national stadium is still debated]. Luxemburger Wort - Edition francophone (in French). Retrieved 4 August 2021.
- ^ "Multimodal opportunities as Luxembourg tramway extension opens". Railway Gazette International. 9 July 2024. Retrieved 24 August 2024.
- ^ "Début des travaux de gros œuvre du parking P+R Cloche d'Or près du stade national de football et de rugby". gouvernement.lu (in French). 2 August 2021. Retrieved 14 August 2021.