Stockton Diamond
Grade separation
By 2020 the junction was the most congested in California, with the level-crossing design contributing to delays throughout the state's rail network. As part of the Valley Rail project, the San Joaquin Regional Rail Commission (SJRRC) and the California Department of Transportation (Caltrans) will grade separate the intersection, which will add capacity for future passenger rail expansion and reduce crossing interference. The Union Pacific line will be elevated above the BNSF line; construction is scheduled to start in 2023 and planned to complete in May 2026.
The north–south flyover tracks will be constructed approximately 200 ft (61 m) to the east of the existing UP Fresno Subdivision, from the UP Stockton Yard to the at-grade crossing at Weber Avenue. Tracks will begin to rise at Lafayette Street and return to grade after Charter Way; a large retaining wall will be constructed between Charter and Church. Road traffic on Charter, Hazelton, and Scotts will be grade-separated under new rail bridges, while the existing at-grade crossings at Church and Lafayette would be closed. When complete, the project also will finish all four sides of the diamond.
See also
References
- ^ Goldeen, Joe (September 20, 2020). "Feds chip in $20M for major Stockton railroad project". The Record. Retrieved October 11, 2020.
- ^ Wanek-Libman, Mischa (September 15, 2020). "The Stockton Diamond project lands $20-million BUILD grant". Mass Transit. Retrieved October 11, 2020.
- ^ Final Environmental Impact Report, State Clearinghouse #2020080321 (PDF) (Report). San Joaquin Regional Rail Commission. June 2021.
External links
- "Stockton Diamond grade separation project". San Joaquin Joint Powers Authority (SJJPA).