Taft Tunnel
History
In late November 1835, the Norwich and Worcester Railroad awarded a contract for construction of the first 8 miles (13 km) of its line from Norwich, Connecticut, to Jewett City, Connecticut. The most difficult section of the railroad to construct, it ran along the rocky ledges of the Quinebaug River and required a short tunnel under Bundy Hill. The tunnel was 300 feet (90 m) long, 23 feet (7.0 m) wide, and 18 feet (5.5 m) high. It was ready for rails to be laid on August 26, 1837, and declared complete two days later. Some passenger and freight service began around September 1839, though the railroad did not officially open until March 9, 1840.
The Taft Tunnel is the oldest common carrier tunnel in the country to be completed, although the Staple Bend Tunnel of the non-common carrier Allegheny Portage Railroad was completed in 1833. However, it was not the first to open - the Yorkville Tunnel (opened October 27, 1837), Black Rock Tunnel (opened 1838), and Howard Tunnel (opened 1838) were all in service before the Taft Tunnel. Now used by the Providence and Worcester Railroad for freight service, the tunnel is still among the oldest active railroad tunnels in the United States.
See also
References
- ^ Farnham, Elmer F. (1973). The Quickest Route: The History of the Norwich and Worcester Railroad. Pequot Press. pp. 14–21. ISBN 0871061155.
- ^ Railroad Men. Vol. 15. Railroad Branch of the Young Men's Christian Association of the City of New York. 1901. p. 351.
- ^ Marteka, Peter (January 27, 2006). "Taft Tunnel Still Active After All These Years". Hartford Courant.
External links
Media related to Taft Tunnel at Wikimedia Commons