Thekna Mine
The Thekna mine began operating in 1959. Between 1957 and 1959 it produced chromium ore only from occurrences. In 1959 production from the mine started. The total combined chromium ore production from the mine between 1959 and 2006 amounted to 1,198,000 tonnes. The deepest level of the mine is the Descenderia No.7 which reaches a depth of 1,560 metres (5,120 ft). The chromium ore reserves of the mine are split into two categories above and below Descenderia No.7. The proven ore reserves located above the Descenderia No.7 amount to 652,300 tonnes of ore grading 38% chromium metal. The proven ore reserves located below the Descenderia No.7 are currently not estimated or calculated but are expected to be grading 45% chromium metal. The mine's total reserves amount to 0.652 million tonnes of ore grading 38% chromium metal. The mine was privatised in 1999.