Torside Reservoir
The Manchester Corporation Waterworks Act 1847 (10 & 11 Vict. c. cciii) gave permission for the construction of the Woodhead and Arnfield reservoirs; the Manchester Corporation Waterworks Act 1848 allowed the construction of Torside and Rhodeswood Reservoirs, and an aqueduct to convey the water to the Arnfield reservoir where it would pass through the Mottram Tunnel to Godley.
It was stated in a statutory report, under the Reservoir Safety Act 1975, dated 12 June, that all five reservoirs could be overtopped during a Probable Maximum Flood. Woodhead, as the fountainhead, would require the most extensive improvements, but Torside needed crest remedial work. The wave wall was demolished and replaced with one 4 metres (13 ft) above the overflow sill. The claycore was extended to 1.34 m (4 ft 5 in) above overflow sill and the road level was raised to 3.29 m (10.8 ft). The work took place between 1993 and 1994.
See also
References
- ^ The Peak District National Park - Fact Zone 21. Longdendale in the National Park Archived 2006-01-04 at the Wayback Machine
- ^ Quayle, Tom (2006), Manchester's Water: The reservoirs in the hills, Stroud, Gloucestershire: Tempus Publishing, ISBN 0-7524-3198-6
External links
- Media related to Torside Reservoir at Wikimedia Commons
Preceded by Rhodeswood Reservoir |
Longdendale Chain Reservoirs (West to East) |
Succeeded by Woodhead Reservoir |