Trolleybuses In Shanghai
For many years, the Shanghai system was also one of the largest in the world, once comprising more than 20 routes and more than 900 vehicles in 1994, accounting for 30% of Shanghai's bus ridership. However the system started to decline in scale and service levels in the late 90s and throughout the 2000s with the fleet shrinking to 150 vehicles in 2012. Those smaller figures still make it one of the largest systems in operation outside the former Soviet Union countries. Since then, the trolleybus network is being expanded with a new expanded fleet of 300 trolleybuses for the 12 surviving lines and the introduction of new eBRT lines using trolleybuses in reserved lanes.
History
The system's original operator was the Shanghai Electric Construction Company, which also operated trams in what was then the city's International sector. In its early years, the system had two routes, served by seven vehicles.
The first trolleybus service, route 14, which began operation on 15 November 1914, was along Fokien Road (now Fujian Road, or Fujian lu); service along Pekin Road (now Beijing Road, or Beijing lu) was introduced in 1915.
As of 1984, and still in 2003, the two original sections were still covered by portions of existing routes 14 and 16, respectively.
In its first 13 days of operation, the system carried 200,000 passengers, and came to be regarded as eminently suited to Shanghai's busy streets. However, the service then had to be temporarily abandoned while the roads on which they operated were strengthened, as the trolleybuses had been pressing down the surface stones with which the roads were paved.
A major expansion approved by the municipal council in 1924 would soon see the network expand from 3.5 km (2.2 mi) to 33.0 km (20.5 mi), and the company purchased 100 new trolleybuses for this expansion.
As of 1985, more than 40 percent of all passenger journeys on the Shanghai City Transport Company's system were made on trolleybuses, even though trolleybuses only made up about 20 percent of the company's fleet (the remainder were diesel buses). There were 19 trolleybus routes at that time, served by 860 articulated vehicles.
In 1994, the system was reported to comprise more than 20 routes, using a fleet of almost 900 vehicles, but in the subsequent years the route and fleet numbers have been in decline. In the late 90s a citywide road widening scheme demolished the overheads for Lines 9, 12, 16, 18 and 27. Later in the 2000s, Lines 21 and 17 were converted to regular buses in 2005 and 2007 respectively. Lines 11路 (11) and 26路 (26) were converted to super-capacitor buses in 2008 ahead of the Expo 2010. Super-capacitor buses are also electrically powered, but their electrical energy is supplied at charging stations at bus stops and termini (via so-called electric umbrellas), instead of by overhead wires. The energy is then stored between charging stations by onboard super capacitors.
The active fleet – the number of vehicles still in regular use – totaled a little more than 200 at the end of 2009. By 2013 the fleet shrunk to around 150 buses as older trolleybuses were retired and not replaced. However, after 2012, approaching the 100th anniversary of Shanghai trolleybus operations, rising awareness for the need of zero emissions transport and realization of trolleybuses as an icon of Shanghai; the Shanghai traffic department decided revitalize and support the development of trolleybuses. The trolleybus fleet was expanded to 300 with new dual-mode trolleybuses that can run 8 to 10 km (5.0 to 6.2 mi) "off-wire" on battery power in 2014. Line 13 was extended and replaced route 922, a regular bus route, using a new fleet of Youngman-Neoplan JNP6120BEV1 dual-mode trolleybuses that run on batteries in sections without overhead wire.
In February 2017, a number of ordinary bus lines running under the Yan'an Elevated Road was altered and transformed into Yan'an Road Medium Capacity Bus Transit System, or route 71路, a trolleybus bus rapid transit line running in the reserved lanes in the center of Yan'an Road. The line is served by a fleet of 40 Yutong ZK5180A articulated bus and 28 Yutong ZK5120C rigid dual-mode trolleybuses. Buses achieved an average operating speed of 17.6 km/h (10.9 mph) on the line. The line has an average weekday ridership of about 54,000 people, making itself the most used bus line in Shanghai. Line 71 doesn't share any overhead wires with other trolleybus routes.
On 28 July 2021, the Shanghai road transport department raised the issue of 'optimising' the traditional trolleybus network, which will result in the removal of all infrastructure on routes 6, 8, 13, 22, 25 and 28 to balance between historical value and space taken by wires. Trolleybuses on these routes will be replaced by electric buses. The withdrawal of trolleybuses on these routes began on 15 August 2022, starting with route 25.
Lines
As of January 2023, the system was made up of the following lines:
Line | Route | Length |
---|---|---|
14路 (Line 14) | Jiangpu Road / North No.2 Zhongshan Road – Dongxinqiao | 9.5 km |
15路 (Line 15) | North Zhejiang Road / East Tianmu Road – Shanghai Stadium | 10.6 km |
19路 (Line 19) | Putuo Road / Jiangning Road – Tangshan Road / Tongbei Road | 10.5 km |
20路 (Line 20) | Jiujiang Road / The Bund – Zhongshan Park (Wanhangdu Road) | 7.7 km |
23路 (Line 23) | South No.1 Zhongshan Road / Xizang Road – Xinkang Li | 9.9 km |
24路 (Line 24) | Doushi Street / East Fuxing Road – Changshou Village | 10.2 km |
71路 (Line 71) | East Yan'an Road / The Bund – Shenkun Road Bus Terminal Partial Line: North Huangpi Road - Shenkun Road Bus Terminal |
17.5 km Partial Line: 15.5 km |
Fleet
The initial, two-route, system that opened in 1914–15 used a fleet of seven trolleybuses. These used chassis built by Railless Electric Traction, in England, and fitted with motors and controllers supplied by Dick, Kerr & Company. Shipped to China in 1914, they were then fitted with bodies fabricated locally by the Shanghai Electric Construction Company, the system's operator at the time. These trolleybuses had three separate compartments, for first-, second- and third-class passengers. The driver was semi-exposed in an open platform at the front.
In 1921, one complete trolleybus was shipped from England. This had the same chassis and propulsion but received a body made by Short Brothers. In 1922, the company purchased another seven Railless chassis with propulsion by English Electric (which had taken over Dick, Kerr & Company in 1919), and fitted them with locally built bodies, to an improved design for which the solitary all-British-built vehicle may have served, in effect, as a pattern. All of these early trolleybuses had solid tyres.
In 1924, following the adoption of a major expansion plan, the Shanghai system placed an order for 100 new trolleybuses, which stood for the next 10 years as the single largest order ever placed for trolleybuses. These vehicles had chassis by Associated Equipment Company (AEC) and propulsion equipment from other British companies, and were fitted with Shanghai-built bodies. Approximately 30 more of the same type were purchased later.
Since the 1950s, almost all trolleybuses entering service on the Shanghai system have been built in Shanghai itself, mostly by a vehicle manufacturing division – commonly referred to in English transport publications simply as "Shanghai" – of the transport operating company, Shanghai City Transport Company.
Production of trolleybuses at the Shanghai factory began in 1951, and the factory has also supplied vehicles to the trolleybus systems in several other Chinese cities. As of 1983, the factory was capable of producing 300 trolleybuses per year.
The first articulated trolleybuses entered service in 1962 or 1963. These were Shanghai-built model SK663, which gradually replaced many two-axle vehicles and went on to become, at one point, the most numerous model of trolleybus in Shanghai's then-large fleet. The SK663 remained in production until 1969, replaced in 1970 by the SK561G, and later by a succession of newer models of articulated trolleybus.
In the early 1980s, more than 800 of the fleet of about 850–900 trolleybuses were articulated, giving Shanghai the distinction of having more articulated trolleybuses than any other city in the world. About 150 of these were the surviving SK663 articulated trolleybuses manufactured in the 1960s. The last two-axle vehicles were withdrawn in 1983, after which the fleet was 100 percent articulated vehicles, with a total of around 860.
Several years later, the operator began purchasing new two-axle trolleybuses, and these gradually replaced all of the articulated vehicles. By at least 2009, when the operating fleet numbered about 280, all vehicles were two-axle.
Since 2001, all new trolleybuses placed into service on the Shanghai system have air conditioning. The last non-air-conditioned units were withdrawn in late 2009. At that time, the fleet size stood at a little over 200 vehicles.
In 2014, Youngman trolleybuses entered service across the entire network.
In January 2022, a voting was held online for netizens to choose the design of newer Sunwin trolleybuses. The contest ended with a retro design being chosen, and the new trolleybuses entered service in September that year.
See also
- List of trolleybus systems
- Public transport in Shanghai
- Buses in Shanghai
- Shanghai Jiushi Group
- Shanghai Metro
References
- ^ Webb, Mary (ed.) (2011). Jane's Urban Transport Systems 2011-2012, pp. "[23]" and "[24]" (in foreword). Coulsdon, Surrey (UK): Jane's Information Group. ISBN 978-0-7106-2954-8.
- ^ Murray, Alan (2000). World Trolleybus Encyclopaedia, pp. 8, 57 and 101. UK: Trolleybooks. ISBN 0-904235-18-1.
- ^ "Shanghai Anniversary" (Nov.-Dec. 2004). Trolleybus Magazine No. 258, pp. 134–135. ISSN 0266-7452.
- ^ Trolleybus Magazine No. 320 (March–April 2015), p. 54. National Trolleybus Association (UK). ISSN 0266-7452.
- ^ Murray, Alan (2000). World Trolleybus Encyclopaedia. Yateley, Hampshire, UK: Trolleybooks. ISBN 0-904235-18-1.
- ^ Humphreys, E. M. H. (May–June 1984). "China 1983, Part 2: Shanghai and Xi'an". Trolleybus Magazine No. 135, pp. 49–55.
- ^ Trolleybus Magazine No. 136 (July–August 1984), p. 95. National Trolleybus Association (UK). ISSN 0266-7452.
- ^ Trolleybus Magazine No. 257 (Sep.-Oct. 2004), pp. 113–116 (full route map of the system as of 2003).
- ^ "Railless Traction in Shanghai, China". Electric Railway Journal. XLV. New York City: McGraw Publishing Company, Inc.: 592 March 20, 1915. Retrieved 26 February 2012.
- ^ Bushell, Chris; and Stonham, Peter (eds.) (1986). Jane's Urban Transport Systems 1986, pp. 327–328. London: Jane's Publishing Company. ISBN 0-7106-0826-8.
- ^ Zhang Kanli (张侃理). 上海无轨电车"复兴":全换成新型辫子车 车辆增加两倍-无轨电车 辫子 高油价时代 混搭 上海公交-上海频道-东方网. sh.eastday.com. Retrieved 2017-09-16.
- ^ Trolleybus Magazine No. 288 (Nov.-Dec. 1989), p. 138.
- ^ "Buses: Clean and Green, Electric Buses". citytransport.info. Retrieved 11 September 2011.
- ^ Trolleybus Magazine No. 290 (March–April 1990), p. 40.
- ^ 优化布局 沪31日起又有3条公交线路暂停营运_新民网_为民分忧 与民同乐. sh.xinmin.cn. Archived from the original on 2013-10-21. Retrieved 2017-09-16.
- ^ 从虹桥到外滩穿过上海“心脏地带” 探秘17.5公里延安路中运量公交工程. www.shanghai.gov.cn (in Chinese). Retrieved 2017-05-12.
- ^ "Yutong 18m double energy powered trolleys put into operation in Shanghai-YUTONG". en.yutong.com. Retrieved 2018-11-17.
- ^ 从虹桥到外滩穿过上海“心脏地带” 探秘17.5公里延安路中运量公交工程. www.shanghai.gov.cn (in Chinese). Retrieved 2017-09-16.
- ^ 中运量公交启动评估 年内添双开门公交同站换乘. sh.sina.com.cn. Retrieved 2017-05-12.
- ^ 新71路日客流5.4万居全市公交线第一 中心城区研究再建新中运量. www.shanghai.gov.cn (in Chinese). Retrieved 2018-11-17.
- ^ 吴春伟. 车速快班次准点 沪中运量公交71路运营已达预期-运量 71路 客流 公交 运营公司-上海频道-东方网. sh.eastday.com. Retrieved 2017-05-12.
- ^ "上海"辫子车"计划保留6条线路,包括中国首条无轨电车线路_浦江头条_澎湃新闻-The Paper". www.thepaper.cn. Retrieved 2021-08-22.
- ^ "上海人的城市记忆!25路"辫子车"正式告别,"翘辫子""煤精亭"你都见过吗?_新民社会_新民网". news.xinmin.cn. Retrieved 2022-08-28.
- ^ 体验过中运量公交 有一句话我一定要讲 | 观察. www.sohu.com. 2017-02-23. Retrieved 2017-09-17.
- ^ Suffolk, David M. (Nov.-Dec. 1984). "More About China". Trolleybus Magazine No. 138, pp. 121–125.
- ^ "青年即充式纯电动公交批量投运上海" (in Chinese). 浙江在线-浙商网. 2014-04-21. Archived from the original on 2016-03-04. Retrieved 2023-01-09.
- ^ "上海百年无轨电车将换"新装" 四种方案请你投票". sh.people.com.cn. Retrieved 2023-01-09.
- ^ "上海百年线路20路老车型退役,复古新车吸引市民打卡,"小辫子"还在吗?". export.shobserver.com. Retrieved 2023-01-09.
External links
Media related to Trolleybuses in Shanghai at Wikimedia Commons
- Trolleybus city: Shanghai (China) Trolleymotion.
- Shanghai database / photo gallery and Shanghai trolleybus list at Urban Electric Transit – in various languages, including English.