U.S. Route 138 In Nebraska
Route description
Colorado
U.S. 138 begins in Sterling at U.S. 6 and Business Loop 76. It goes northeast and intersects Colorado State Highway 113 southwest of Iliff. It becomes more easterly as it goes through Iliff, Proctor and Crook, where it intersects Colorado State Highway 55. It continues on to Sedgwick, where it meets Colorado State Highway 59. After passing through Ovid, it then meets U.S. Highway 385 west of Julesburg, and they overlap into Julesburg. Also in Julesburg, U.S. 138 intersects Colorado State Highway 11. U.S. 138 then leaves Julesburg going northeast and enters Nebraska.
Nebraska
Shortly after entering Nebraska, U.S. 138 intersects Interstate 80. It continues east from I-80 and enters Big Springs. At Big Springs, U.S. 138 turns north and ends at U.S. Highway 30.
History
The western terminus is in Sterling, Colorado, where it met U.S. Route 38 from 1926 to 1931 (US 38 became U.S. Route 6); the eastern terminus is at U.S. Route 30 north of Big Springs, Nebraska. US 138 is an example of a "child" route that has long outlived its "parent"; before U.S. Route 99 was decommissioned in 1964, US 138 was the only US route to not have a "parent" route.
Major intersections
State | County | Location | mi | km | Destinations | Notes |
---|---|---|---|---|---|---|
Colorado | Logan | Sterling | 0.000 | 0.000 | SH 14 west (Chestnut Street) / US 6 to I-76 – Holyoke, Atwood, Brush, Fort Collins | Western terminus; eastern terminus of SH 14; highway continues as US 6 west (3rd Street south) |
Front Street | Interchange; eastbound entrance only | |||||
| 8.970 | 14.436 | SH 113 north – Peetz, Sidney | Southern terminus of SH 113 | ||
Crook | 27.503 | 44.262 | SH 55 south – Fleming | Northern terminus of SH 55 | ||
Sedgwick | Sedgwick | 43.413 | 69.866 | SH 59 south – Haxtun, Yuma | Northern terminus of SH 59 | |
| 54.810 | 88.208 | US 385 north – Chappell, Sidney | West end of US 385 overlap | ||
Julesburg | 56.956 | 91.662 | SH 11 north to I-80 | Southern terminus of SH 11 | ||
58.534 | 94.201 | US 385 south to I-76 – Holyoke | Interchange; east end of US 385 overlap | |||
59.823 0.00 | 96.276 0.00 | Colorado–Nebraska line | ||||
Nebraska | Deuel | | 3.06– 3.51 | 4.92– 5.65 | I-80 – Sidney, North Platte | Partial cloverleaf interchange; exit 101 on I-80 |
Big Springs | 9.44 | 15.19 | L-25B to I-80 | Northern terminus of L-25B | ||
| 11.47 | 18.46 | US 30 – Ogallala, Chappell | Eastern terminus | ||
Road 207 – Lewellen | Continuation beyond eastern terminus | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
- ^ "Highway Data Explorer". Colorado Department of Transportation. Archived from the original on September 10, 2012. Retrieved July 20, 2014.
- ^ "Nebraska Highway Reference Log Book" (PDF). Nebraska Department of Roads. 2015. p. 280. Retrieved January 8, 2017.
External links
- Endpoints of U.S. Highway 138
- Colorado Highways: Routes 120 to 139
- The Nebraska Highways Page: Nebraska Highways 101 to 300
- Nebraska Roads: Nebraska US Highways 136-183
Browse numbered routes | ||||
---|---|---|---|---|
← SH 136 | CO | → SH 139 | ||
← N-137 | NE | → US 159 |