Loading
  • 21 Aug, 2019

  • By, Wikipedia

U.S. Route 7 (Connecticut)

U.S. Route 7 (US 7) is a north–south United States Numbered Highway which runs 78 miles (126 km) in the state of Connecticut. The route begins at Interstate 95 (I-95) in Norwalk starting out as a four-lane freeway until the Wilton town line. The route then proceeds north as a two-lane surface road through Redding and Ridgefield, where it becomes a four-lane surface road until it reaches Danbury. The route becomes a four-lane freeway again, eventually merging with I-84 for a brief period before it turns and proceeds north with US 202 in Brookfield. The freeway section terminates at an intersection with US 202 at the FairfieldLitchfield county line next to Candlewood lake. The route then continues north as a four-lane arterial road to New Milford, where it becomes a two-lane surface road, running north to the Massachusetts border in North Canaan. US 7 was aligned to its current route around 1930, and, since then, three sections totaling around 12 miles (19 km) have been upgraded to freeway standards.

Route description

US 7 in Connecticut is also known as Route 7, the Ethan Allen Highway (named after a Revolutionary general), and Super 7. It is mostly a surface road but has two short freeway sections in the Norwalk and Danbury areas. US 7 begins in Norwalk with a four-mile (6.4 km) freeway that runs nearly to the Wilton town line. There are three exits on this short section, signed as The Forty Third Infantry Division Memorial Highway, named after the 43rd Infantry Division. Exit 1, just past the southern terminus at I-95, leads to the Central Norwalk Business District and US 1. Exit 2 leads to Route 123 which extends from US 1 in Norwalk through the town of New Canaan to the New York state line. After exit 2, the freeway reduces to four lanes from six. Exit 3 leads to the Merritt Parkway (Route 15) southbound. This interchange was half built and only allows southbound access from the freeway; northbound access is gained via Route 123 at exit 2. Plans are being developed to eventually complete the interchange. The freeway section ends at Grist Mill Road in Norwalk, about one-half mile (0.80 km) past exit 3.

Near Danbury, another freeway section was built beginning one mile (1.6 km) south of I-84 near Danbury Municipal Airport. This section is also signed as The Forty Third Infantry Division Memorial Highway. Through Danbury proper, US 7 overlaps with I-84 for about four miles (6.4 km). Through this section of freeway, I-84, US 6, US 7, and US 202 all run concurrently. US 7 and US 202 then leave I-84 at exit 7 and travel on their own freeway for approximately seven miles (11 km) to just south of the New Milford town line. On this section there are two exits. At exit 11, US 202 exits the freeway, and at exit 12, US 202 crosses back over US 7. On southbound US 7, the exit for I-84 eastbound is signed as exit 10. The US 7 freeway then bypasses Brookfield to the west and terminates at an intersection with US 202 at the Fairfield–Litchfield county line.

US 7 is cosigned with US 202 until central New Milford, where US 202 turns east with Route 67 while US 7 continues north. Recent construction has also made large parts of US 7 between the terminus of the freeway and New Milford a four-lane arterial road. North of New Milford center, US 7 remains a two-lane surface road through the rest of Connecticut. US 7 has a short 0.35-mile (0.56 km) concurrency with US 44 in North Canaan before continuing north for another 1.5 miles (2.4 km) to the Massachusetts state line.

History

The precursor to US 7 was New England Route 4 (Route 4). When US 7 was commissioned, it followed the whole route of Route 4. It entered Connecticut from the north in North Canaan and then followed Route 41 southwest to Sharon and into New York state. This alignment had US 7 follow New York State Route 22 (NY 22) to a southern terminus in New York City rather than in Norwalk. This southern terminus was shifted to Norwalk around 1930 and was rerouted onto other existing state highways of the time to get from Canaan to Norwalk. From Canaan to New Milford, the road was known as State Highway 134 and, from there to Danbury, was State Highway 128. From Danbury to Ridgefield, the road was part of another New England route, Route 3, which was paved in 1924. From Ridgefield to Norwalk was State Highway 126.

Early planning of the Interstate Highway System in the late 1940s and early 1950s envisioned an Interstate route (I-89) paralleling US 7 from Norwalk, Connecticut to the Canada–United States border north of Burlington, Vermont. Connecticut's portion of this freeway was to have paralleled US 7 from Norwalk to Danbury, then follow I-84 around Danbury before branching off to the north and paralleling US 7 and US 202 to New Milford. North of New Milford, the proposed freeway would have continued northward paralleling US 7 through the remainder of Connecticut and into Massachusetts. Of the proposed freeway plan, the section from I-95 to Grist Mill Road in Norwalk, and the segment from Miry Brook Road in Danbury to US 202 at the Brookfield–New Milford town line were built. Construction on the initial freeway segments in Norwalk began in 1969 and in Danbury and Brookfield in 1970, but lawsuits brought on by residents within the highway's path and environmental groups halted construction north of Route 123 in 1972. With an approved environmental impact statement, construction resumed in 1986 between Route 123 and Grist Mill Road in Norwalk and from I-84 to Miry Brook Road in Danbury. The Danbury section opened in 1987, while the extension of the US 7 freeway to Grist Mill Road opened in 1992. Lack of funding and continued opposition to the freeway has prevented construction of the remainder of the proposed highway between Grist Mill Road and Danbury. Instead, from 2003 to 2008, the existing US 7 was widened from two to four lanes from Grist Mill Road to Wolfpit Road in Wilton and from the Route 35 intersection in Ridgefield to the freeway terminus at Miry Brook Road in Danbury. The Connecticut Department of Transportation (CTDOT) has stated its intent to eventually extend the southern section of the US 7 freeway from Grist Mill Road in Norwalk to Route 33 in Wilton (approximately three miles [4.8 km]), but no timetable or funding source has been defined for this project.

Construction on the section between I-84 and exit 12 began in 1974 and was completed in 1976. The Brookfield bypass segment between exit 12 and the current freeway terminus opened in November 2009, after two years of construction. The former US 7 route through Brookfield is now signed solely as US 202.

Junction list

CountyLocationmikmExitDestinationsNotes
FairfieldNorwalk0.000.00
I-95 north – Bridgeport, South Norwalk
Southern terminus; access to South Norwalk via West Avenue

I-95 south – New York City
Southbound exit and northbound entrance; exit 15 on I-95
1.181.901 US 1 – Norwalk
1.832.952

Route 123 (New Canaan Avenue) to Route 15 north (Merritt Parkway)
Route 15 not signed southbound
2.934.723
Route 15 south (Merritt Parkway) – New York City
Exits 16-17A on Route 15 / Merritt Parkway
3.956.36Northern end of freeway section
4.116.61

To Route 15 north (Merritt Parkway) – New Haven
Access via Main Avenue
Wilton6.039.70
Route 33 south (Westport Road)
Southern terminus of Route 33 concurrency
6.2910.12
Route 106 south (Wolfpit Road)
Southern terminus of Route 106 concurrency
6.4710.41
Route 106 north (Sharp Hill Road)
Northern terminus of Route 106 concurrency
7.3011.75
Route 33 north – Wilton Center, Ridgefield, New Canaan
Northern terminus of Route 33 concurrency
Georgetown11.6518.75

Route 57 south / Route 107 north – Redding, Weston, Westport
Northern terminus of Route 57; southern terminus of Route 107
Ridgefield12.5620.21
Route 102 west – Ridgefield, Weir Farm
Eastern terminus of Route 102
16.8827.17
Route 35 south – Ridgefield, Aldrich Museum
Northern terminus of Route 35
Danbury20.4332.88Southern end of freeway section
21.0133.817 Danbury AirportAccess via Miry Brook Road
21.0933.948Park AvenueNo southbound entrance; serves Danbury Fair Mall
21.5634.709 (NB)
3 (SB)

I-84 west – Newburgh
Southern terminus of I-84 concurrency
21.6334.814

US 6 west / US 202 west (Lake Avenue)
Southern terminus of US 6 / US 202 concurrency; no southbound entrance
23.1437.245


Route 37 north / Route 39 north / Route 53 south – Downtown Danbury, Bethel
Route 37 not signed southbound
23.7138.166 Route 37 – New FairfieldSouthbound exit and northbound entrance
25.21–
25.30
40.57–
40.72
7 (NB)
10 (SB)

I-84 east (US 6 east) – Waterbury
Northern terminus of I-84 / US 6 concurrency
Brookfield26.5542.7311
US 202 east (Federal Road)
Northern terminus of US 202 concurrency
29.8848.0912 US 202 – Brookfield
31.8251.21Northern end of freeway section

US 202 west – Brookfield Center
Southern terminus of US 202 concurrency
LitchfieldNew Milford37.2459.93

US 202 east / Route 67 south – Roxbury, Litchfield, Washington
Northern terminus of US 202 concurrency; northern terminus of Route 67
39.9364.26
Route 37 south – New Fairfield, Sherman
Northern terminus of Route 37
44.3671.39
Route 55 west
Eastern terminus of Route 55
Kent50.8881.88 Route 341 – South Kent, Warren, Macedonia Brook State Park
Cornwall58.7494.53
Route 45 south – Litchfield, Warren
Northern terminus of Route 45
59.8796.35
Route 4 east – Cornwall, Goshen, Ski Area, Torrington
Southern terminus of Route 4 concurrency
60.1296.75
Route 4 west
Northern terminus of Route 4 concurrency
64.27103.43
Route 128 east – West Cornwall, Covered Bridge
Western terminus of Route 128
Lime Rock68.83110.77
Route 112 west – Lime Rock, Salisbury
Eastern terminus of Route 112
Canaan70.62113.65 Route 126 – Falls Village, Goshen
71.90115.71
Route 63 south – Cornwall, Goshen
Northern terminus of Route 63
North Canaan76.46123.05
US 44 east – Norfolk, Winsted
Southern terminus of US 44 concurrency
76.80123.60
US 44 west – Salisbury
Northern terminus of US 44 concurrency

Route 7A north – Ashley Falls
Access via SR 832; former routing of US 7
78.29126.00
US 7 north – Sheffield
Continuation into Massachusetts
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ Connecticut Department of Transportation (December 31, 2010). "Highway Log" (PDF). Connecticut Department of Transportation.
  2. ^ Kara, Jake (March 3, 2015). "Is Super 7 Back from the Dead?". The Ridgefield Press. Retrieved July 3, 2018.
  3. ^ Sanders, Jack (October 18, 2016). "About Town: Ethan Allen". The Ridgefield Press. Retrieved July 3, 2018.
  4. ^ Mandel, Peter (December 6, 2017). "New England's Ultimate Road Trip: Rolling Along Route 7". HuffPost. Retrieved July 3, 2018.
  5. ^ Koch, Robert (October 17, 2017). "DOT: All Alternatives Remain on Table for Route 7–Merritt Parkway Overhaul". The Hour. Retrieved July 3, 2018.
  6. ^ "State DOT Gives Update on Route 7 Merritt Parkway Interchange Rebuild". Yonkers, NY: News 12 Westchester. October 18, 2017. Retrieved July 3, 2018.
  7. ^ Urban Engineers (July 2012). Route 7 Corridor Assessment and Implementation Plan: City of Norwalk and Town of Wilton, CT (PDF). South Western Regional Planning Agency. Retrieved July 3, 2018.
  8. ^ "U.S. Route 7 (Connecticut) New Milford Construction" (PDF). WestCog.org. Retrieved July 4, 2018.
  9. ^ Connecticut State Highway Log Archived 2015-09-05 at the Wayback Machine
KML is from Wikidata


U.S. Route 7
Previous state:
Terminus
Connecticut Next state:
Massachusetts