Uwada Dam
Uwada Dam is a gravity dam on the Tadami River 500 m (1,640 ft) downstream of Kaneyama in the Fukushima Prefecture of Japan. It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation. It supplies a 63.9 MW power station with water.
See also
- Miyashita Dam – located downstream
- Honna Dam – located upstream
References
- ^ "Tohoku Electric Power Plant Uwada" (in Japanese). Suiryoku. Retrieved 27 August 2011.
Wikimedia Commons has media related to Dams in Fukushima prefecture.