Van Brienenoordbrug
The bridge carries 12 lanes of traffic of the A16 motorway, the busiest highway in the Netherlands. Additionally, on the outside of the east arch, a two-way segregated cycling bridge has been mounted.
Including lead-up ramps, the Van Brienenoord Bridge is 1320 meters long and vessels with up to 24 meters air draft can pass under the closed bridge. With a span of 300 meters, it is the longest span road bridge in the Netherlands.
Traffic exceeds 235,000 vehicles crossing the bridge daily, using four 3-lane carriageways, in an express versus local / distributor arrangement.
History
The east arch (287.5 m long) was built in 1965, constituting the original Van Brienenoord Bridge. In 1990 the bridge received a major upgrade, by the addition of a second, almost identical arch (305 m long and slightly broader) right next to its west flank, doubling its traffic capacity.
The bridge is named after the Eiland van Brienenoord (Isle of Brienenoord) in the river, on which some of its pillars are built. The little island was named after its former owner, baron Arnoud Willem van Brienen van de Groote Lindt in 1847. The Dutch suffix oord means a place.
An average of 150.000 ships pass the bridge every year. Approximately 500 of these ships require the bridge to be opened, a process which takes 18 minutes total. Suspending road traffic and opening the bridge takes 4 minutes, letting the ship pass takes 10 minutes, and closing the bridge requires another 4 minutes. During this time, road traffic is blocked by boom barriers. As of November 2005, the bridge is no longer controlled locally but from the nearby city of Rhoon, where the region's Road Traffic Control is located.
A request to open the bridge for shipping needs to be made at the harbor authorities at least three hours in advance.
An electro-mechanical failure on 17 March 2006 left the bridge open for about an hour, on the middle of day, causing traffic jams up to 7 kilometres in length. The western bridge was closed first, restoring traffic to Breda. The eastern bridge was closed at approximately 1 AM, restoring traffic to The Hague and Utrecht. On 5 November 2006 it failed to close again, this time due to an electrical failure, forcing engineers to close the bridge manually.