WMU Soccer Complex
The stadium opened in 2005. The first upgrades were in 2012, when the field was fenced and team shelters were added. A paved parking lot, a formal entry and walkways, and a press box were added in 2013. New bleacher seating was installed in 2015,
The grass turf of the playing field received a major overhaul of during the summer of 2017 with removal of the top layer of soil by fraze mowing, laser-guided grading, and a new drainage system. At the same time, a new scoreboard was installed along with new fencing, a new flagpole, and new nets behind the goals.
In addition to the stadium, the complex includes a full-sized practice field, electronic scoreboard and sound system, covered bench shelters, and a concession stand with a storage shed.
References
- ^ "WMU Soccer Complex". Western Michigan University. Retrieved August 30, 2017.
- ^ "Metro & state: WMU getting $75,000 renovations at soccer complex". Detroit Free Press. April 22, 2017. Retrieved August 30, 2017.
- ^ "WMU Soccer Complex". Western Michigan University. Retrieved August 30, 2017.
External links
42°15′27″N 85°38′30″W / 42.25758°N 85.64163°W