Wester Pipe Railway
Route
The line starts in Hastigrow and runs 7.8 kilometres (4.8 mi) east south east towards the coast where the depot of Subsea 7 is located.
Operations
The railway is owned and operated by Subsea 7, who operate the railway and the pipelines around it to their port in Westerloch near Wick. The railway uses ocean-going tugs to operate it. Pipeline segments are combined at a site on the inland end of the railway and then towed to the sea, using the vessels. The individual pipes are often brought to Scotland by train as well. They are transported onto the railway by being taken to Georgemas Junction and then finish their journey to the Subsea 7 site by road. Entire pipelines are transported along the rail, giving it the record for the longest thing ever to be transported by rail: a 7.7-kilometre (4.8 mi) long pipe, only 100 metres (330 ft) shorter than the main section of railway itself. Many of the tracks were re-laid in 2014.
Four lines exist West of the bridge under the A99 road, however the main stem of the railway is just two tracks. This allows the sections to be completed concurrently, then joined together just before the road bridge.
References
- ^ rogerfarnworth (11 May 2019). "Caithness Double-Track Narrow Gauge Line". Roger Farnworth. Retrieved 23 September 2021.
- ^ Melford, Lucy (4 July 2019). "Lucy Melford: The Long Pipe". Lucy Melford. Retrieved 23 September 2021.