Loading
  • 21 Aug, 2019

  • By, Wikipedia

Wyoming Highway 319

Wyoming Highway 319 (WYO 319) is a 28.75-mile-long (46.27 km) north-south state highway in Platte and Converse counties.

Route description

WYO 319 is a north–south highway that follows the old Yellowstone Highway, therefore the current highway is named Old Yellowstone Highway. WYO 319 begins at an interchange with Interstate 25/U.S. Route 26/U.S. Route 87 (I-25/US 26/US 87; exit 100) and from there heads northeast then north towards Glendo. At 6.21 miles (9.99 km), WYO 319 has an intersection with a local road which heads west to exit 104 off I-25/US 26/US 87. Still heading north, WYO 319 enters Glendo from the south, intersecting A Street at 14.16 miles (22.79 km). A Street is designated as WYO 319 Spur for 0.2 miles (0.32 km) between WYO 319 and I-25/US 26/US 87 (exit 111). As WYO 319 leaves Glendo, at 15.4 miles (24.8 km), there is a road named Lake Shore Road that travels east of WYO 319 and allows access to Glendo State Park, one of Wyoming's most popular boating parks. WYO 319 heads northwest and parallels I-25/US 26/US 87 that lies to the west and the Glendo Reservoir/North Platte River that lies to the east. I-25/US 26/US 87 breaks its parallel and leaves to head more northwest towards Douglas, while WYO 319 turns north to come to an end at US 18/US 20 in Orin at 28.84 miles (46.41 km).

History

WYO 319 is the original alignment of Old US 185 between 1926 and 1936 and US 87 (Yellowstone Highway) from 1936 until I-25 was completed (between 1956 and the 1980s) and therefore routed along it.

Major intersections

CountyLocationmikmDestinationsNotes
Platte0.000.00I-25 / US 26 / US 87 – Wheatland, GlendoSouthern terminus; I-25 exit 100
Glendo14.6023.50
A Street (WYO 319 Spur) to I-25
ConverseOrin28.7546.27 US 18 / US 20 – Douglas, LuskNorthern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Wyoming Highway 319 Spur

LocationGlendo
Length0.20 mi (320 m)

Wyoming Highway 319 Spur (WYO 319 Spur) is an unsigned 0.20-mile (0.3 km) long spur route of WYO 319 in Glendo. WYO 319 Spur travels from WYO 319 west to I-25/US 26/US 87 (exit 111) at the Glendo Interchange.

References

  1. ^ Wyoming Department of Transportation Reference Marker Book - November 2004 (PDF) (Map). WYDOT. Archived from the original (PDF) on July 17, 2011. Retrieved 2011-03-31.
  2. ^ "Glendo State Park".
  3. ^ "Wyoming State Route Log: 300 through 399". AARoads.
  4. ^ "Wyoming Highway 319" (Map). Google Maps. Retrieved 26 December 2016.
  5. ^ "Wyoming @ AARoads - U.S. Highway 185 (Decommissioned)". www.aaroads.com.
  6. ^ "Wyoming @ AARoads - U.S. Highway 87". www.aaroads.com.
  • Official 2003 State Highway Map of Wyoming
KML is from Wikidata