Yaek Lam Sali MRT Station
Yaek Lam Sali station (Thai: สถานีแยกลำสาลี) is a Bangkok MRT station on the Yellow Line. The station is located on Srinagarindra Road in Bang Kapi District, Bangkok and is named after Lam Sali Intersection where the Srinagarindra and Ramkhamhaeng roads intersect adjacent to the station. The station has four entrances. It opened on 12 June 2023 as part of trial operations on the line between Hua Mak and Phawana.
In the future, it will become an interchange station to the Orange Line, which is currently under construction, and the Brown Line which is under planning.
Station layout
U3 | Side platform, doors will open on the left | |
Platform 1 | Yellow towards Samrong (Si Kritha) | |
Platform 2 | Yellow towards Lat Phrao (Bang Kapi) | |
Side platform, doors will open on the left | ||
U2 | Concourse | Exit 1-4, Ticket machines |
G | - | Bus stop, Lam Sali intersection |
References
- ^ "โครงการรถไฟฟ้าสายสีเหลือง ช่วงลาดพร้าว-สำโรง". MRTA Official Website. Archived from the original on 2017-12-16.
- ^ "อัพเดตความคืบหน้า รถไฟฟ้าสายสีเหลือง ! 2566". The List.
- ^ "รฟม. ขยายเส้นทางเปิดทดสอบการเดินรถเสมือนจริง (Trial Run) รถไฟฟ้ามหานคร สายสีเหลือง ตั้งแต่วันที่ 12 มิถุนายน นี้ เป็นต้นไป จากสถานีภาวนา ถึง สถานีสำโรง ระหว่างเวลา 06.00 น. – 20.00 น." www.mrta.co.th (in Thai). Retrieved 2023-06-09.
- ^ "รถไฟฟ้าสายสีเหลือง เตรียมขยายสถานีให้บริการ ตั้งแต่ภาวนา-สำโรง เริ่ม 12 มิ.ย.นี้".
- ^ "MRT Orange Line construction update May 2023". MRTA PR. 12 May 2023.